Laserfiche WebLink
O <br /> ® CHEN:MOO RE <br /> ® &Assoaims" <br /> • Miami-Dade County Pine Shores Level of Service standards. The proposed <br /> • Drainage Improvement Project. Chen stormwater design included the introduction <br /> m Moore & Associates provided engineering of catch basins and stormwater piping to <br /> design services for the Pine Shores Drainage effectively collect and route the stormwater to <br /> O Improvement Project. We analyzed the 11 existing outfalls to Biscayne Bay. Due to <br /> O existing drainage systems and designed a the environmental sensitivity of Biscayne Bay <br /> system to handle the 5 year - 1 day storm design and implementation of water quality <br /> O event. treatment measures was an important <br /> • consideration and design factor of the system <br /> Pinecrest SW 104th Street Drainage prior to outfall to the Bay which included <br /> O Improvements. Chen Moore and Associates utilizing exfiltration trench. Additionally, as <br /> O was contracted by the Village of Pinecrest to the outfalls were existing a review and <br /> provide design and permitting related services evaluation of the conditions of the outfalls <br /> ® to address drainage concerns along the north was conducted and rehabilitation, upsizing <br /> • side of SW 104th Street at the intersection and retrofitting the existing outfalls was a <br /> with SW 77`h Avenue. Proposed drainage part of the final design. This project was <br /> O improvements included drainage structures closely coordinated with regulatory agencies <br /> O and exfiltration trench within the public right at the outset of the project and throughout <br /> O of way to address the drainage problem. the design to ensure an expedient review and <br /> issuance of the permit. <br /> O Miami Beach Sunset Islands 1 & 2 <br /> Right-of-Way Improvements. Chen Moore North Miami Beach NE 173rd Street Right <br /> O and Associates is the prime consultant of Way Improvements. Chen Moore and <br /> • responsible for planning, design, permitting, Associates prepared right-of-way <br /> O bid and award and construction engineering improvement plans for NE 173rd Street from <br /> and inspection services for infrastructure West Dixie Highway to NE 23rd Avenue within <br /> • improvements within the public right of way an existing residential community. The <br /> O <br /> areas of the Sunset Islands I & II design included stormwater improvements, <br /> neighborhood of Miami Beach. The project formalizing of onstreet parking, <br /> O encompasses +11,000 LF of ROW traffic/roadway modifications, sidewalks with <br /> O infrastructure improvements including water ADA grading considerations and preserving <br /> main replacements, stormwater drainage and incorporating existing trees and resident <br /> • improvements, paving & grading, traffic requests. This project also included the <br /> O pavement marking and signing related design of a traffic circle to provide traffic <br /> enhancements and roadway reconstruction. calming as well as streetscape beautification <br /> • Extensive coordination with adjacent with a stamped concrete apron and <br /> O residents and with environmental agencies landscaping. The design plans were permitted <br /> was necessary due to the projects via the City of North Miami Beach, Miami- <br /> O environmentally sensitive location and Dade County Department of Environmental <br /> O surrounding environmental resources. Resources Management and Miami-Dade <br /> County Public Works Traffic Engineering <br /> • As part of the project stormwater and Department. Services included design, <br /> O drainage services, extensive analysis was permitting, bidding assistance and limited <br /> conducted utilizing ICPR modeling and GIS to construction administration services <br /> 0 meet and/or exceed required stormwater <br /> 0 <br /> 0 <br /> 0 <br /> O RFQ# 12-04-02 <br /> ® Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> O www.chenmoore.com <br /> ® 3-16 <br /> 0 <br />