My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B <br /> ® CH0 <br /> ENMOORE <br /> ® s issoauts <br /> ® Oscar R. Bello, PE <br /> ® Senior Engineer <br /> to <br /> ® Education improvements, paving & grading, <br /> Bachelor of Science, Civil Engineering, streetscaping enhancements, landscaping <br /> ® University of Central Florida, 1999 improvements, lighting improvements, and <br /> ® roadway reconstruction. This project also <br /> Registration required extensive coordination with the <br /> ® Professional Engineer, Florida, 61612, 2004 public, adjacent CRAB, historic districts and <br /> ® various regulatory agencies. <br /> ® Professional Affiliations <br /> • American Public Works Association As part of the proposed stormwater and <br /> • American Society of Civil Engineers drainage services, extensive analysis was <br /> ® • Environmental Coalition of Miami and conducted utilizing ICPR Modeling and GIS to <br /> the Beaches meet and/or exceed required stormwater <br /> ® • Florida Engineering Society Level of Services standards. The proposed <br /> ® • National Society of Professional stormwater design included the introduction <br /> Engineers of catch basins and stormwater piping to <br /> ® effectively collect and route the stormwater to <br /> Summary sixteen drainage gravity wells with overflow <br /> ® Mr. Bello has more than 12 years of outfall connections to Biscayne Bay. Due to <br /> • experience in planning, design, permitting, the environmental sensitivity of Biscayne Bay <br /> ® <br /> and construction management of water, design and implementation of water quality <br /> wastewater, and drainage municipal projects treatment measures was an important <br /> ® in Florida. Mr. Bello has worked as a project consideration and design factor of the system <br /> ® <br /> manager and project engineer for various prior to outfall to the Bay and was closely <br /> projects in South and Central Florida. He coordinated with regulatory agencies during <br /> • currently manages municipal projects for the the permitting process. <br /> • City of Miami Beach, City of Dania Beach, <br /> Florida Keys Aqueduct Authority and the City Dania Beach - NW 1st Ave <br /> ® of Key West. Water/Stormwater Improvements. Chen <br /> Moore and Associates was selected by the <br /> ® Project Experience City of Dania Beach for the NW 1st Ave <br /> ® Miami Beach South Pointe Phase project, which includes replacing existing <br /> ® III/IV/V — Right of Way Improvement water main and providing drainage <br /> Project. Chen Moore and Associates is the improvements. The project area is <br /> ® prime consultant and is responsible for commercial, where many existing utilities <br /> ® providing surveying, planning, geotechnical including gas main, sanitary sewer, fiber-optic <br /> investigation, design, permitting, preparation cables and other AT&T / Bellsouth utilities are <br /> ® of construction documents, bid and award and located. Therefore the placement of the <br /> • construction engineering and inspection exfiltration trench and new water main was a <br /> services for infrastructure improvements challenge in this small one way road. <br /> ® within the public right of way areas of the Approximately 1400 linear feet of 12" water <br /> ® South Pointe III/IV/V neighborhood of Miami main as well as 700 linear feet of exfiltration <br /> Beach. The project encompasses trench have been designed and is currently <br /> ® approximately 19,000 LF of ROW within the permitting phase. <br /> ® infrastructure improvements including water <br /> main replacements, stormwater drainage <br /> e RFQ# 12-04-02 <br /> 0 Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> • www.chenmoore.com <br /> O 3-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.