Laserfiche WebLink
• CHEN MMOORE <br /> • &ASSOCIATES <br /> stormwater drainage improvements, paving & model existing conditions and show peak stages <br /> • grading, streetscaping enhancements, during various storm events which was calibrated <br /> • landscaping improvements, lighting utilizing data and observations during recent <br /> improvements, and roadway reconstruction. storm events. The existing conditions model <br /> • This project also required extensive developed by CMA confirmed that the existing <br /> • coordination with the Public, adjacent CRAB, basin areas did not meet the Village Stormwater <br /> historic districts and various regulatory Level of Service standard and CMA is currently <br /> • agencies. working with the Village to determine the best <br /> • value solutions to meet the Level of Service <br /> Miami Beach South Pointe Phase requirements. <br /> • III/IV/V — Right-of-Way Improvement <br /> • Project. Chen Moore and Associates is the Miami Lakes Lake Patricia Roadway & <br /> prime consultant and is responsible for Drainage Improvements. Chen Moore and <br /> ® providing surveying, planning, geotechnical Associates is implementing drainage <br /> • investigation, design, permitting, preparation improvements identified on the most recent Town <br /> of construction documents, bid and award and of Miami Lakes Stormwater Master Plan for <br /> e construction engineering and inspection approximately one square mile of an existing <br /> • services for infrastructure improvements residential neighborhood near Lake Patricia in <br /> within the public right of way areas of the southern Miami Lakes near Ludlam Road. <br /> . South Pointe III/IV/V neighborhood of Miami Services include utility coordination, schematic <br /> • Beach. The project encompasses and final design phases, government permitting, <br /> approximately 19,000 LF of ROW bidding assistance, construction administration <br /> ® infrastructure improvements including water and statements of work completion. The final <br /> • main replacements, stormwater drainage design included approximately 1,900 LF of <br /> improvements, paving & grading, exfiltration trench and rehabilitation/upsizing of 6 <br /> ® streetscaping enhancements, landscaping existing outfalls. CMA is also assisting Miami <br /> • improvements, lighting improvements, and Lakes with the acquisition of potential grant <br /> • <br /> roadway reconstruction. This project also opportunities. <br /> required extensive coordination with the <br /> ® public, adjacent CRAs, historic districts and Miami Gardens NW 191st Street Drainage <br /> • various regulatory agencies. Improvements. Chen Moore and Associates was <br /> asked by the City of Miami Gardens to design the <br /> ® Pinecrest Pine Needle Lane & Rock Garden stormwater improvements for the residential area <br /> • Lane Stormwater Analysis Study. CMA is from NW 9th Avenue to NW 10th Place and from <br /> currently providing a stormwater analysis study NW 191st Street to NW 193rd Street. The design <br /> ® of a +/- 90 acre residential area within the had a total construction budget of over $400,000 <br /> • Village of Pinecrest to address resident concerns per a grant received by the City. CMA evaluated <br /> regarding drainage. The Rock Garden Lane and the existing site conditions to strategically design <br /> • Pine Needle Lane basin areas of the Village are roadway, drainage and sidewalk improvements to <br /> • closed drainage basins with elevation changes of meet the most critical needs of the City and <br /> +/- 10 feet from the highest portions of the basin maximize the value of their construction budget. <br /> • to the lowest portions and currently served only The design considered elements related to the <br /> • with exfiltration trench. Initial analysis conducted pedestrian paths and parallel parking adjacent to <br /> by CMA utilizing LIDAR data assisted in Norland High School. The project scope included <br /> ® identifying the basin boundaries and contributing government permitting, bidding services and <br /> • area to be +/- 90 acres which was previously construction administration to support the efforts <br /> believed to be only +/-37 acres by the Village. of City staff. <br /> • Utilizing XP SWMM modeling, CMA was able to <br /> • <br /> ® RFQ# 12-04-02 <br /> Continuing Professional Architectural & Engineering Services Firms Only (CCNA) <br /> • www.chenmoore.com <br /> • 3-14 <br /> • <br />