My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 0 <br /> ® 4. Approach/Methodology <br /> 0hen Moore and Associates (CMA) has over 25 years of experience in providing consulting civil <br /> Cengineering, environmental engineering, landscape architecture and planning services for local <br /> • public sector clients throughout the State of Florida. Because of our extensive experience on municipal <br /> • projects (including neighborhood redevelopment/improvement, stormwater, water, sewer, roadway, <br /> ® due diligence, etc.) for public sector clients in Miami-Dade County, including projects for the Town <br /> of Miami Lakes, the City of Miami Gardens, the City of North Miami Beach, the City of Miami Beach, <br /> B the Village of Pinecrest and Miami Dade County, we have developed proven, efficient, cost effective <br /> • methods to deliver projects to our clients on time and within budget. We work as an extension of <br /> ® our clients' staff as a trusted advisor who is familiar with the technical aspects of a project and the <br /> regulatory/permitting requirements. Furthermore, we take into consideration and communicate with <br /> • all stakeholders involved to ensure a smooth-running project. We ensure that our clients remain well <br /> ® informed throughout the process through frequent communication and regular project updates. We <br /> ® make sure that our staff is accessible to handle any client needs that arise during the project. <br /> ® The following details the approach that CMA intends to utilize for the successful completion of projects <br /> in civil and environmental engineering for the City of Sunny Isles Beach. <br /> ® Planning and Scope <br /> In the undertaking of any project, CMA understands the need to provide innovative and sustainable <br /> solutions. Paramount in completing a successful project on time and within budget is to clearly define <br /> ® the scope and goals. In defining the scope, following are some of the factors that will be considered: <br /> • Project goals,timeline and budget <br /> • • Any unique characteristics and considerations (resident/hotline complaint logs, special <br /> • characteristics,etc.) <br /> ® • Existing available information (available utility atlases,as-builts, operating reports,etc.) <br /> ■ Additional information that will need to be obtained (survey, geotechnical studies, traffic studies, <br /> • etc.) <br /> ■ Potential impacts of construction to: parking; bus routes; emergency access and vehicular flow; <br /> pedestrian routes;community events;existing utilities; etc. <br /> ■ Project stakeholders (affected residents, HOAs, public agencies,etc.) <br /> ® ■ Regulatory authorities having jurisdiction and permitting agencies <br /> ® <br /> • Project funding <br /> ■ Construction requirements and limitations <br /> ® At the outset of the project it is necessary to clearly define the scope and goals of the project. <br /> ® Experienced Proven Team <br /> The CMA Team has a long standing record of working successfully and effectively for municipal clients on <br /> • similar contracts.We currently hold over 35 continuing service contracts within Miami-Dade, Broward, <br /> O Monroe and Palm Beach Counties. Our services for civil engineering continuing service contracts have <br /> included the following: <br /> B <br /> • Stormwater and Infrastructure Master Planning <br /> • ■ Pump Station Design and Rehabilitation "z•: <br /> • Water Supply,Treatment and Distribution Design tive, <br /> ® <br /> • Stormwater Management System Design i=: . <br /> II Environmental Engineering !!! -- <br /> • • Due Diligence -'''fj. `' <br /> Q <br /> • Roadway Design and StreetscapeftJP <br /> ® <br /> • Traffic Calming Design <br /> k�l[ 6 <br /> Y .f • <br /> • Circulation and Roundabout Design -e y <br /> ® <br /> • Infrastructure Master Planning .1.7.,11n1r <br /> CH Etlo l'RE <br /> RIO No.12.04-02 Continuing Professional Architectural&Engineering Services Firms Only(fCXA) <br /> Category:CivilEngineering 4-1 <br /> swssocwns <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.