Laserfiche WebLink
0 <br /> ■ Government Permitting <br /> ® <br /> • Value Engineering <br /> • Utility Rate and Infrastructure Valuation Studies <br /> ® <br /> • Stakeholder Meetings <br /> ® <br /> • Site Planning <br /> ® ■ Hardscape Design <br /> ■ Irrigation Design <br /> ® ■ Parks Design <br /> ® <br /> • Greenway and Trails Design <br /> • Pedestrian and Bicycle Pathway Design <br /> ® ■ Habitat Restoration <br /> • • Wayfinding <br /> o <br /> • GIS Analysis and Mapping <br /> • Project and Program Management <br /> ® <br /> • Sustainability Design and LEED Solutions <br /> ® Our project manager,Jose L.Acosta,P.E.,will be your Trusted Advisor on this project.Please consider him <br /> ® as the Chen Moore leader and extension of your own staff. Jose will be there to ensure communication <br /> ® of your infrastructure needs and work together with your leaders to find innovative and cost effective <br /> ways of addressing the needs of Sunny Isles Beach. <br /> ® Our team includes in-house planning and landscape architecture expertise along with our extensive <br /> B civil engineering experience. This allows us to bring quality designs that work with the planted <br /> ® environment to create the projects that your residents will be proud to see on a regular basis.Our team <br /> includes subconsultants (Judy Carty, AIA – Carty Architecture; Drew Badri, PE – PSI for Geotechnical <br /> ® Services;lames Stoner,PLS–Stoner and Associates)that we have continuously worked with throughout <br /> our geographical reach to bring the quality service your projects deserve. <br /> ® Existing Site Assessment and Planning . <br /> ® In preparation of a task order proposal, CMA performs a s;j'1/4 <br /> . 7, <br /> number of existing site assessment tasks for each project to `.••P •ua1 <br /> ® become familiar with the project area. These initial tasks will <br /> ® result in time savings to the project and to the City of Sunny — <br /> 1.1 <br /> Isles Beach.These include the following I ;� <br /> ® 1)Utility atlases and/or as-built information f I> <br /> ® CMA has requested a locate design ticket, is already aware r"tt <br /> of existing utilities within the project area and has requested _ . •. <br /> ® available utility atlases and/or as built information for theSir <br /> O following utilities: <br /> ® ■ Water–Water service is provided by the City of North Miami Beach Utilities. <br /> ® <br /> • Sewer–Sewer service is provided by Miami Dade Water and Sewer Department. <br /> ■ AT&T–Existing AT&T utility lines within the project area. <br /> ® ■ FPL–Existing FPL underground utility lines within the project. <br /> ® ■ TECO–Existing gas lines <br /> • City of Sunny Isles Beach Stormwater – Existing stormwater inlets, pipes and outfalls within the <br /> ® project <br /> B <br /> • FDOT Stormwater–Existing stormwater inlets and pipes <br /> ■ Miami-Dade County Public Works – Existing traffic signals and control boxes exist within the <br /> project <br /> ® <br /> • City of Sunny Isles Beach Street Lighting–Existing street lighting and electrical wiring. <br /> 0 <br /> 100 CHEN:MOPRE RIO No.12-04-02 Continuing ProfessionolArrhitectural&EngineeringServices Firms Only(((NA) <br /> • Category Civil Engineering 4-2 <br /> 6ASSOCNIES <br />