My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> ® Water and Sewer <br /> ® CMA has extensive experience in the design of water main, force main, gravity sewer and lift station <br /> design for municipalities and utilities.Our engineers have the experience to address the more important <br /> • utility issues and work to recommend and prioritize phasing for potential improvements.Whether it is <br /> ® improving the access for fire protection, reviewing the potential for reclaimed water through a portion <br /> ® of the City, or reviewing a segment of <br /> J'. development on behalf of the City, CMA can <br /> • �- 11assist in each one of these design needs. <br /> t. <br /> • ? r; l <br /> ® Na' ,2�, , _ r ) 1 .rt. <br /> t. i ,i iA •-. 1 (`( sf <br /> • !, <br /> I r I17- <br /> .t1 <br /> ® ') ,/ _ . . , r <br /> ® :_ .... <br /> ® Project Design <br /> ® Upon final review and analysis of existing conditions along with initial modeling efforts,alternatives can <br /> be developed for review with City of Sunny Isles Beach Staff and the Miami-Dade County Permitting, <br /> • Environment and Regulatory Affairs(PERA formerly DERM), Miami-Dade Water and Sewer Department <br /> ® and/or North Miami Beach (water/sewer utility), and the Fire Department and staff, as necessary, to <br /> ® achieve identified project goals. Based on initial analysis,proposed alternatives will be presented to the <br /> • City of Sunny Isles Beach along with an estimated project budget, a time line to complete the project, <br /> and an achieved level-of-service goal. In addition, CMA will identify the constraints of the proposed <br /> ® options. CMA will review the proposed alternatives with City staff, answer any questions/concerns <br /> ® raised by the City,and receive City input to identify the best solution to achieve the project goals.Once <br /> the best alternative is identified, CMA will develop proposed project plans and bidding documents to <br /> • construct the proposed project. <br /> • As part of the project design, CMA utilizes the latest available software to develop construction <br /> • documents.The Chen Moore team typically implements the latest versions of AutoCAD,AutoCAD Civil <br /> 3D,GIS and Microsoft Office programs to develop construction plans and contract documents. <br /> o Having worked almost exclusively with public clients, the Chen Moore team has a proven ability to <br /> accurately and expeditiously handle the project delivery method of a public client, most of which are <br /> • quite similar,as most procurement is part of State statutes. <br /> ® Cost Estimating <br /> • Another important part of the project design is the project cost estimate.CMA uses two main methods <br /> ® for determining accurate unit prices in order to arrive at an accurate cost estimate. The first method <br /> is to consult with the construction management staff to determine the current bidding climate. The <br /> ® second method is to consult with other public sources,such as various municipal and county purchasing <br /> • websites,to follow patterns in the bidding of other similar projects. <br /> • <br /> B <br /> • CHEN*aM'Dl'RE RPoNo.11-04-01 Continuing Professional Architectural&Engineering Services Firms Only(((NA) <br /> ® Category:Civil Engineering 4.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.