Laserfiche WebLink
® Permitting <br /> ® For any construction project,permits and required regulatory agency approvals from authorities having <br /> jurisdiction are required.Since the approval of permit applications can define the schedule of a project, <br /> ® CMA researches the needs and time frames for permits as far in advance as possible.Typical agencies <br /> B that may have jurisdiction on a proposed project within the City of Sunny Isles Beach for roadway and <br /> ® drainage projects are listed below: <br /> ■ Miami-Dade County Permitting, Environment and Regulatory Affairs(PERA formerly DERM) <br /> • Miami-Dade County Public Works Department <br /> ® <br /> • Miami-Dade County Traffic Engineering Department <br /> • • South Florida Water Management District <br /> • Florida Department of Environmental Protection <br /> ® • Florida Department of Transportation <br /> • ■ US Army Corps of Engineers <br /> ® ■ Miami-Dade Water and Sewer Department and/or North Miami Beach Utilites <br /> ® Coordination <br /> Coordination is another aspect of the project that will start at the very beginning.Through experience, <br /> • CMA has learned that a project can only be successful when open lines of communication exist between <br /> ® the Engineer and the City,the public,various agencies,services and other consultants.Only by working <br /> • together can every stakeholder feel that their individual experience contributed to the successful <br /> completion of the project. <br /> ® Coordination with the City <br /> When a project commences,the Chen Moore Project Manager establishes communication with the City <br /> • through regular phone and email correspondence. This practice is continued throughout the duration <br /> of the project in order to ensure a successful project. Our project managers have experience leading <br /> project progress meetings, briefing elected officials, participating in construction meetings, meeting <br /> ® with regulatory agencies and speaking at public meetings involving citizens and residents. CMA is also <br /> • available to attend City Commission meetings upon request. <br /> • Construction Administration <br /> ® The in-house construction engineering inspectors at CMA are backed by years of experience and the <br /> assistance of the engineers assigned to the project.The Chen Moore Team is very familiar with the entire <br /> ® bidding process. Recent experience involved large construction contracts going to bid as part of the <br /> • Miami Beach Capital Improvement Projects and Broward County Neighborhood Improvement Projects. <br /> ® However, in many instances, smaller contracts were processed for various projects in municipalities <br /> throughout South Florida such as the City of Miami Gardens and the Village of Pinecrest. In many <br /> ® different capacities,the Chen Moore team can administer all the bid process needs of the City of Sunny <br /> • Isles Beach. <br /> • Depending upon the specific needs of each project, the Chen Moore Team will make construction <br /> • irL inspectors available full time,or at critical junctures <br /> e during the project, for certification and testing. It is <br /> ® = = essential during construction to have ongoing <br /> • e 7 :<< n communication between the Client, Contractor, <br /> ;.1 _. Consultant and Community. <br /> • <br /> • ,It9;..pit a <br /> ihrst- <br /> -art ud; ` y ; <br /> ® - 4==S <br /> 1114 <br /> CH ENe�MO V RE RNNo.12-04-01 Continuing Professional,IArchitectural&Engineering Services Firms Only((CNA) <br /> • Category:Civil Engineering 4-6 <br /> 6ASSOQAUS <br /> 0 <br />