My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMC Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
DMC Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 1:59:21 PM
Creation date
2/2/2016 1:59:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
predgina el Marina Consultants <br /> ethune Point Park Pier <br /> ® Dx- <br /> — Evaluation and Design <br /> ENGLIVEER$ . SCIENTISTS City of Daytona Beach, Florida <br /> tumillINallamm1/4 —1-- <br /> Completion Date: 2007 <br /> Engineering Fees: $13,500 <br /> Construction Cost: $82,500 <br /> Dredging 8 Marine Consultants, LLC (DMC) <br /> engineers provided surveying, engineering 1 '�°�' + ° i <br /> and designing for the reconstruction of the ()H' it � ,� 0--- _,existing pier at the Bethune Point Boat Ramp lltll. fI li;° ° t� r "Et r <br /> as well as determine the elevation of the dock: 1.4,--: 4, - " r. '''C.-71''' <br /> This project also involved surveying all.pilings - '` -=___, . _� -# <br /> and corners of the;floating dock, designing the, s =T <br /> vinyl,concrete encasing of the wooden piles" _ _ e. <br /> and-ensuring;ADA compliance. Visit to the site <br /> was also conducted to-assess the overall The Key Aspects of the Project <br /> integrity of the pier structure. - ._ Were: <br /> ® ---- • Survey, Engineering and Design. <br /> Contact: • Engineering evaluation of <br /> synthetic-plankproducts <br /> James R. Sloane • Structural assessment-_, <br /> Deputy Public Works Director • Assisted in preparation of Bid` <br /> City of Daytona Beach Documents and bidding - <br /> 301 Ridgewood Ave. • Attend pre-bid meeting and. <br /> Daytona Beach, FL address public concerns and <br /> (386) 671-8610 project issues _ • <br /> `- — •_ Conduct final inspection of f pier <br /> `� t r ,v. <br /> �6`�`!� and project close-out <br /> `� k• ~�* <br /> �� - ti <br /> v .--0.„.5,--_- __, -.�4,-C Iii 1 �-4 .• -, ,I„-.°.-e. <br /> ! +\ <br /> 111 <br /> ff Before t ; ; " 1 +9 e' ' N <br /> : \ <br /> ---:_y„.%,-.4„,:.•,-re, ,,. ;«� --spa 1/4 <br /> ® -_ z__-1 a _ After ,, " <br /> 4643 S.Clyde Moms Blvd., Unit 302, Port Orange, FL 32129 Tel (386) 304-6505 Fax: (386)304-6506 www.dmces.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.