Laserfiche WebLink
Qredgin9 A Marino Conqultants <br /> ® Dm cHalifax Harbor Marina <br /> Shoreline Stabilization <br /> ENGIN€€RS • SCIENTISTS City of Daytona Beach, Florida <br /> Completion Date: 2005 <br /> Engineering Fees: $20,000 <br /> Construction Cost $300,000 -14 4(DMC)DMC LLC 40,� <br /> ,`i�yT � <br /> Dredging & Marine Consultants, r` <br /> engineers assisted the city of Daytona Beach _ y� a ,r=, u <br /> with the installation of a permanent monument <br /> at the Halifax Harbor Marina Park shoreline to _ -r-'fit <br /> ensure construction activities were landward = =� <br /> at this site. DMC assisted with the design and - rr 10_ <br /> permitting of the wave-break and seawall to }Yyry <br /> -- : <br /> protect uplands and stormwater pond berms. <br /> The City selected the contractor and completed <br /> - . Vv ."bt <br /> the actual construction of the seawall project. - _. c 1 Jt <br /> ,L ` a` :.. :< -,a <br /> s 17= <br /> .34 <br /> ^+ ` " '` f The Key Aspects of the Project <br /> i71 <br /> t fzt i .j, Were: <br /> • 114"*� " • Design, and permit wave-break <br /> t = structure and seawall <br /> �:� y ` • Environmental Assessment <br /> ,.. w <br /> • Review and finalization of <br /> ivr <br /> °` "t * ey-t-t'��� - Technical Specification and <br /> Contacts: ...ft- • _ drawings <br /> • Assisted with construction <br /> James R. Sloane inspection of wave-break <br /> City Engineer/Deputy Public Works Director <br /> City of Daytona Beach <br /> Daytona Beach, FL <br /> (386) 671-8000 <br /> 4643 S.Clyde Monis Blvd., Unit 302, Port Orange, FL 32129 Tel (386)304-6505 Fax: (386) 304-6506 www.dmces.com <br />