® PROJECT EXPERIENCE (CONT'D) <br /> Canal Conveyance Capacity Program Phase 1, South Florida Water Management District — Field <br /> reconnaissance of 45 miles of canals for conveyance capacity. Report writing on feasibility and cost <br /> estimate to dredge and repair areas of concern discovered during field reconnaissance. Assess all <br /> canal wetland and vegetation impacts. <br /> Canal Conveyance Capacity Program Phase 2, South Florida Water Management District - <br /> Assessment of approximately 5 miles of existing G-16 drainage canal for the SFWMD Canal <br /> Conveyance Capacity Program in Broward County. Reviewed as-built plans and surveyed the entire <br /> canal right-of-way including: documentation of existing conditions, focusing on areas of potential canal <br /> bank erosion and failure, outfall pipe and structure replacement needs and sediment accumulation <br /> mapping within the canal. Completed water quality and sediment testing for both physical and chemical <br /> parameters. The chemical parameters included metals, nutrients, pesticides, herbicides, PAHs, Oil and <br /> Grease, specific conductance and pH. Also provided a Final report documenting all the conditions, <br /> findings and recommendations for repair and associated costs. <br /> Dredge Material Disposal Site Assessments, St. Lucie County, FL — Ecologist. Assessed seven <br /> upland sites as potential temporary and permanent sediment disposal areas. Sites were evaluated for <br /> environmental resources, threatened and endangered species (including scrub jays and gopher <br /> tortoises), engineering practicality, and proximity to dredge project. Coordinated with the county's <br /> environmental, public works, and airport staff as well as with state and federal regulatory agencies. <br /> Taylor Creek Emergency Shoreline Stabilization, St. Lucie County, FL — Project Manager, <br /> Ecologist, Onsite Inspector. Completed Permitting through DEP, ACOE, and SFWMD. Coordinated all <br /> necessary survey and geotechnical work. Inspected construction and ensured project completion <br /> within NRCS grant timeline. Assisted with as-built review, materials confirmation, and contract <br /> closeout. <br /> Taylor Creek Restoration Dredging and Shoreline Stabilization, Phase 2 & 3, St. Lucie County, <br /> FL — Dredging and Shoreline Stabilization of SFWMD diversion canal. Assisted with all biological and <br /> ecological assessments, including threatened and endangered species, particularly seagrasses, <br /> mangroves, gopher tortoise survey and relocation, scrub jay survey and endangered plant survey. <br /> Assessed 7 separate parcels for spoil site location. Coordinated with FDEP, ACOE, SFWMD, and FWC <br /> to obtain permits. Prepared and conducted pre-bid and pre-construction meetings and construction <br /> inspections. <br /> Anclote River Maintenance Dredging, City of Tarpon Springs, FL—Onsite Inspector. Prepared and <br /> implemented environmental compliance plan, turbidity monitoring and daily inspection. Created weekly <br /> reports for compliance with regulatory agencies and County. Coordinated work with City staff and Client <br /> (Contractor) <br /> Summerall Park Boat Ramp and Park Improvements, City of Tavares, FL — Ecologist- Completed <br /> resource survey, sediment sampling and analyses, mitigation plan, and environmental permitting. <br /> Wooton Park Boat Ramp Extension Dredging, City of Tavares, FL — Project Ecologist. Completed <br /> successful time sensitive Environmental Resource Permitting. Assisted in assessing the shoreline <br /> vegetation along with sampling and evaluation of resources within the channel template to be dredged <br /> along boat ramp. <br />