® PROJECT EXPERIENCE (CONT'D)
<br /> Canal Conveyance Capacity Program Phase 1, South Florida Water Management District — Field
<br /> reconnaissance of 45 miles of canals for conveyance capacity. Report writing on feasibility and cost
<br /> estimate to dredge and repair areas of concern discovered during field reconnaissance. Assess all
<br /> canal wetland and vegetation impacts.
<br /> Canal Conveyance Capacity Program Phase 2, South Florida Water Management District -
<br /> Assessment of approximately 5 miles of existing G-16 drainage canal for the SFWMD Canal
<br /> Conveyance Capacity Program in Broward County. Reviewed as-built plans and surveyed the entire
<br /> canal right-of-way including: documentation of existing conditions, focusing on areas of potential canal
<br /> bank erosion and failure, outfall pipe and structure replacement needs and sediment accumulation
<br /> mapping within the canal. Completed water quality and sediment testing for both physical and chemical
<br /> parameters. The chemical parameters included metals, nutrients, pesticides, herbicides, PAHs, Oil and
<br /> Grease, specific conductance and pH. Also provided a Final report documenting all the conditions,
<br /> findings and recommendations for repair and associated costs.
<br /> Dredge Material Disposal Site Assessments, St. Lucie County, FL — Ecologist. Assessed seven
<br /> upland sites as potential temporary and permanent sediment disposal areas. Sites were evaluated for
<br /> environmental resources, threatened and endangered species (including scrub jays and gopher
<br /> tortoises), engineering practicality, and proximity to dredge project. Coordinated with the county's
<br /> environmental, public works, and airport staff as well as with state and federal regulatory agencies.
<br /> Taylor Creek Emergency Shoreline Stabilization, St. Lucie County, FL — Project Manager,
<br /> Ecologist, Onsite Inspector. Completed Permitting through DEP, ACOE, and SFWMD. Coordinated all
<br /> necessary survey and geotechnical work. Inspected construction and ensured project completion
<br /> within NRCS grant timeline. Assisted with as-built review, materials confirmation, and contract
<br /> closeout.
<br /> Taylor Creek Restoration Dredging and Shoreline Stabilization, Phase 2 & 3, St. Lucie County,
<br /> FL — Dredging and Shoreline Stabilization of SFWMD diversion canal. Assisted with all biological and
<br /> ecological assessments, including threatened and endangered species, particularly seagrasses,
<br /> mangroves, gopher tortoise survey and relocation, scrub jay survey and endangered plant survey.
<br /> Assessed 7 separate parcels for spoil site location. Coordinated with FDEP, ACOE, SFWMD, and FWC
<br /> to obtain permits. Prepared and conducted pre-bid and pre-construction meetings and construction
<br /> inspections.
<br /> Anclote River Maintenance Dredging, City of Tarpon Springs, FL—Onsite Inspector. Prepared and
<br /> implemented environmental compliance plan, turbidity monitoring and daily inspection. Created weekly
<br /> reports for compliance with regulatory agencies and County. Coordinated work with City staff and Client
<br /> (Contractor)
<br /> Summerall Park Boat Ramp and Park Improvements, City of Tavares, FL — Ecologist- Completed
<br /> resource survey, sediment sampling and analyses, mitigation plan, and environmental permitting.
<br /> Wooton Park Boat Ramp Extension Dredging, City of Tavares, FL — Project Ecologist. Completed
<br /> successful time sensitive Environmental Resource Permitting. Assisted in assessing the shoreline
<br /> vegetation along with sampling and evaluation of resources within the channel template to be dredged
<br /> along boat ramp.
<br />
|