Laserfiche WebLink
S`arECH Staffing <br /> ® Enrineen Planner. Son.+..r. <br /> STE Team has the combined staff resources that can be dedicated to this contract to effectively fulfill the <br /> requirements for issued task assignments. Clifford Loutan, P.E. the Project Manager, is the Director of <br /> Engineering and shall be committed to the City for the duration of the contract. Charles Rossi, PLS is the <br /> director of Surveying and will provide necessary survey information to support engineering design. STE <br /> shall dedicate sufficient staff i.e., Design Engineers, CADD Operators and Field Representatives to support <br /> the Project Manager on all assignments and shall ensure that these staff members are available at all times to <br /> complete tasks in the most prompt and professional manner. <br /> Like most firms and individuals in today's economy, workloads have decreased. STE will give this contract <br /> top priority and, if selected, we will guarantee that work will be completed on time and within budget and to <br /> the highest degree of professional standards <br /> Sun-Tech Engineering (STE) is proud of our ability to fast track or expedite projects. Effective project <br /> management and adherence to operational protocol by all personnel including sub-consultants will ensure that <br /> projects are completed in the most efficient and expeditious manner. Management of personnel time, <br /> performance and productivity combined with the great technological advancements in electronic data <br /> management and transfer will enable the STE Team to fast-track any given task under this contract. <br /> STE will maintain an active web site with a secure .FTP link for City staff and / or other consultants to <br /> download and upload documents for prompt review and comments. Autodesk Design Review software will <br /> be available to allow City staff and sub-consultants to view, print, measure, and mark up and revise 2D and <br /> 3D drawings without the original design-creation software. This allows a fully paperless review and approval <br /> process. Once the drawing is reviewed electronically with Autodesk Design Review software, the drawing <br /> ® <br /> can be uploaded back into the .FTP site with corrections and comments noted to enable immediate response <br /> by the STE Team. Utilizing this software significantly reduces time for review and approval cycles and <br /> reduces printing and shipping costs. STE currently utilizes this procedure with the Miami Dade \Vater and <br /> Sewer Authority resulting in much quicker and more accurate turnaround. <br /> City of Sunny Isles Beach • o <br /> TECH Continuing Professional Architectural& ` <br /> ...:--., • �. Engineering Services Firms Only(CCA'A) •� <br /> RFP NO. 12-04-02 � <br /> 16 <br />