My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SUN-TECH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SUN-TECH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 2:00:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S`arECH Staffing <br /> ® Enrineen Planner. Son.+..r. <br /> STE Team has the combined staff resources that can be dedicated to this contract to effectively fulfill the <br /> requirements for issued task assignments. Clifford Loutan, P.E. the Project Manager, is the Director of <br /> Engineering and shall be committed to the City for the duration of the contract. Charles Rossi, PLS is the <br /> director of Surveying and will provide necessary survey information to support engineering design. STE <br /> shall dedicate sufficient staff i.e., Design Engineers, CADD Operators and Field Representatives to support <br /> the Project Manager on all assignments and shall ensure that these staff members are available at all times to <br /> complete tasks in the most prompt and professional manner. <br /> Like most firms and individuals in today's economy, workloads have decreased. STE will give this contract <br /> top priority and, if selected, we will guarantee that work will be completed on time and within budget and to <br /> the highest degree of professional standards <br /> Sun-Tech Engineering (STE) is proud of our ability to fast track or expedite projects. Effective project <br /> management and adherence to operational protocol by all personnel including sub-consultants will ensure that <br /> projects are completed in the most efficient and expeditious manner. Management of personnel time, <br /> performance and productivity combined with the great technological advancements in electronic data <br /> management and transfer will enable the STE Team to fast-track any given task under this contract. <br /> STE will maintain an active web site with a secure .FTP link for City staff and / or other consultants to <br /> download and upload documents for prompt review and comments. Autodesk Design Review software will <br /> be available to allow City staff and sub-consultants to view, print, measure, and mark up and revise 2D and <br /> 3D drawings without the original design-creation software. This allows a fully paperless review and approval <br /> process. Once the drawing is reviewed electronically with Autodesk Design Review software, the drawing <br /> ® <br /> can be uploaded back into the .FTP site with corrections and comments noted to enable immediate response <br /> by the STE Team. Utilizing this software significantly reduces time for review and approval cycles and <br /> reduces printing and shipping costs. STE currently utilizes this procedure with the Miami Dade \Vater and <br /> Sewer Authority resulting in much quicker and more accurate turnaround. <br /> City of Sunny Isles Beach • o <br /> TECH Continuing Professional Architectural& ` <br /> ...:--., • �. Engineering Services Firms Only(CCA'A) •� <br /> RFP NO. 12-04-02 � <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.