My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SUN-TECH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SUN-TECH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 2:00:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATV Approach/Methodology <br /> ® Engineer. : Planner. ' Sunnor' -- <br /> Because the performance of most projects requires the efforts of more than one individual or team <br /> member may be working on a project simultaneously over an extended period of time, Sun-Tech <br /> Engineering (STE) adopts the team approach with the Project Manager directly responsible to the <br /> Client for the performance of the firm. The team approach offers a degree of continuity, awareness <br /> of the status of the project and a formal mechanism for the exchange of information and coordination <br /> among team members whether they be in-house, client representatives or outside consultants. <br /> The initial step for any project is the preparation of a preliminary performance schedule and project <br /> management strategy. The performance schedule will identify all required steps and milestones <br /> necessary to take the project from its current stage to completion. It allows the entire team to <br /> understand the overall scheduling strategy necessary to accomplish all the tasks in the correct <br /> sequence. In addition to the performance schedule, STE will implement the following project <br /> management tools: <br /> Setting up Project Guidelines <br /> At the beginning of any project, STE works with Client to prepare Guidelines which is distributed to <br /> the team. The Project Guidelines includes all Client requirements, all code requirements and design <br /> approvals the project must follow by City. State and Federal jurisdictions. <br /> Communication <br /> It is critical at the start of the project to establish proper protocol and follow a "Chain of Command" <br /> and point of contact for team members. Formats will be established for faxes, memos, phone <br /> conversations and e-mails. <br /> STE is proud of our ability to fast track or expedite projects. Effective project management and <br /> adherence to operational protocol ensure that projects are completed in the most efficient and <br /> expeditious manner. Management of personnel time, performance and productivity combined with <br /> the great technological advancements in electronic data management and transfer enable STE to <br /> expedite permitting and communication with other consultants or agencies. One of the most time <br /> effective methods we utilize is a secure web site with a FTP link for City staff and/or other <br /> consultants to download and upload documents for prompt review and comment. This process <br /> allows others to view, print, measure, and mark up and revise 2D and 3D drawings. Utilizing this <br /> technology significantly reduces time for review and approval, project coordination for other <br /> disciplines, and is also eco-friendly by creating a fully paperless review and approval process which <br /> eliminates/minimizes shipping costs. STE currently utilizes this procedure with the Miami Dade <br /> Nater and Sewer Department as well as many sub-consultants. <br /> Team Directory <br /> The Team Directory includes the entire design team and their role or responsibility, municipal <br /> contacts and other participants that may be involved in the project. <br /> ab City of Sunny Isles Beach -'- cal Yr, <br /> ' Continuing Professional Architectural& <br /> 1.�:_... n..-• •-•n-• Engineering Services Firms Only(CCA) <br /> RFP NO. 72-04-02 ,• <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.