My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> • City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> through Miami-Dade County Public Works, and then saw them through to <br /> ® construction. <br /> I, <br /> ® CONSTRUCTION MANAGEMENT <br /> ® Once design of a locally-preferred alternative is completed, Corradino has the <br /> ® ability and experience in estimating construction costs and time lines, bidding <br /> ® projects, selecting consultants and managing the actual construction, to assure <br /> ® the city that each project is constructed according to the plans. Corradino's <br /> ® approach to construction management will not be a passive exercise limited to <br /> ® merely observing and documenting daily construction activities. The <br /> ® construction inspectors will perform their inspections based on a pro-active, <br /> structured, inspection program, which will include inspection guide books, pre- <br /> activity meetings, daily inspections, and final acceptance. <br /> 0 The inspection team will prepare a punch list of incomplete or defective work <br /> ® prior to completion Of each work item as well as prior to Final Acceptance of <br /> ® the project. When all incomplete or defective work has been remedied, the <br /> ® City will be advised of acceptability of the project completeness and <br /> ® recommend issuance of a Certificate of Substantial Completion. The team will <br /> verify and report/the completion of all punch list items. <br /> ® The Corradino.,team-is highly proficient in the procedures and training required <br /> ® to perform accurate .material testing services including: sarhpling, testing and <br /> ® results compilation and.documentation. We are also experienced in the <br /> ® implementation of both' CQC and non-COC projects. The majority of our <br /> personnel are certified by FDOT to perform on-site Asphalt; Earthwork and <br /> ® Concrete sampling and testing. <br /> ® _ - <br /> ® MUNICIPAL ENGINEERING <br /> ® Many municipalities are tasked with the review of traffic impact analysis of <br /> ® development applications. Corradino has been assisting many cities with this for <br /> ® years. The firm purposely has no significant private-sector work so that it may <br /> ® function as an unbiased advocate for the municipalities. There are no conflicts <br /> of interest. Additionally, having reviewed these impact analyses for so long, <br /> ® from each of the engineering firms that perform them for the development <br /> ® community, Corradino understands how these analyses may be manipulated by <br /> applicants to show minimal impacts to the community. This understanding is a <br /> valuable tool in assuring that each developer pays their fair share to mitigate <br /> ® rnno A riiwjrs 2-6 <br /> V V 1% l A V 1 I 11 V <br />
The URL can be used to link to this page
Your browser does not support the video tag.