Laserfiche WebLink
• <br /> • <br /> • City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ® planning system toward implementation. Currently, Corradino is working for the <br /> ® Broward MPO as their general planning/engineering consultant. <br /> 0 <br /> ® LONG RANGE TRANSPORTATION PLANNING <br /> ® Corradino is the developer of the South East Florida Regional Planning Model, <br /> ® (SERPM). This is the transportation planning model that all South Florida MPOs <br /> ® use when they conduct their long range transportation plans (LRTP). Corradino <br /> ® has conducted similar LRTPs across the nation. These programs project a 25- <br /> ® year time horizon. <br /> ® As projects move from the latter years of an LRTP toward implementation, they <br /> ® are subject to more formal analysis. For complex projects, they must undergo <br /> ® scrutiny in light of environmental concerns and public review to select a locally- <br /> ® preferred alternative. These occur in Project Development 'and Environment <br /> studies (PD&E) as well as Alternatives Analyses (AA). Corradino has successfully <br /> ® performed multiple PD&E and AA studies over the past decodes. Some of these <br /> ® have led to ground-breaking projects: The US-1 PD&E study selected a preferred <br /> ® alternative and alignment for one of the nation's first Bus Rapid Transit systems. <br /> ® As part of this paradigm-shifting project, roadway capacity *as converted to <br /> ® transit capacity. .Land use was deeply considered, resulting in evaluating <br /> ® pockets of density along US-1 in South Dade, which would ultimately be built as <br /> ® Transit Oriented Developments, feeding the transit capacity, and assisting in the <br /> ® maintenance of the Urban Development Boundary., _More recently, the 1-95 <br /> ® Express project explored-the concept of managed lanes on 1=95, allowing for a <br /> variable toll in coordination with 'bus rapid transit, which effectively created a <br /> ® transit link between Downtown Fort Lauderdale and•Downtown,Miami. This was <br /> ® also one of the first projects of its kind. • <br /> ® DESIGN / <br /> ® As locally-preferred alternatives are selected, they move into more formal <br /> ® designs and then construction. This is when they move to the first 5 years of the <br /> ® LRTP, which is known as the Transportation Improvement Program (TIP). <br /> ® Corradino has designed all manner of roadway, streetscape, and traffic- <br /> calming projects. For the City of Hialeah, Corradino played an integral role in <br /> ® the infrastructure-redevelopment process undertaken over the last decade. <br /> ® Corradino performed dozens of roadway designs, taking them through the <br /> permitting and construction management processes. For Palmetto Bay and <br /> ® Miami, the firm designed high-quality traffic calming, had them permitted <br /> 0 m on A fllkly 2-5 <br />