My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® City of Sunny Isles Beach RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> MINIMUM QUALIFICATIONS <br /> The Corradino Group and its subconsultants are registered corporations in good <br /> ® standing with the State of Florida. <br /> 0 <br /> O. The Corradino Group has been in business for more than 41 years, providing <br /> ® similar services to municipalities across Florida since that time. <br /> S <br /> The Project Manager on this effort will be Mr. Mike Ciscar, PE, Corradino's Vice <br /> a President of Engineering and Planning. Mr. Ciscar has 24 years of experience in <br /> the field of civil and transportation_engineering. He oversees all of Corradino's <br /> ® engineering operations in South Florida. .Corradino's projects range from water <br /> and sewer planning and design to major expressway corridor studies, highway <br /> ® design, and construction assistance. Prior to joining Corradino, Mr. Ciscar had a <br /> ® distinguished 16 year career with the Florida Department of Transportation's <br /> District Six office and-served as the District Environmental Management Engineer <br /> for nearly six years. In his capacity as the Environmental Management Engineer, <br /> $ he directed the activities of the District Environmental Management Office to <br /> ensure compliance with all FDOT objectives, Departmental policies, and FHWA <br /> ® requirements, as well as, all federal, state, and local laws and regulations. The <br /> ® primary function of the 'office was to perform Project Development and <br /> ® Environmental , (PD&E) studies. This entails performing engineering and <br /> ® environmental studies, documenting the studies in the -form, of engineering <br /> reports and environmental documents, and conducting extensive public and <br /> inter-governmental coordination. Mr. Ciscar was.responsible for obtaining all <br /> U r <br /> environmental permit and approvals for all of the District's projects. <br /> • <br /> ® Members of the team that will work on this project each have over five years of <br /> ® experience in the field. ; <br /> S <br /> 0 <br /> S <br /> S <br /> ® ^.vnV%AVIIv 2-13 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.