My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> 9 <br /> ® City of Sunny Isles Beach - RFQ No. 12-04-02-Troffic Engineering &Transportation Consulting <br /> ® NORTH SHORE URBAN DESIGN/ENGINEERING/CONSTRUCTION <br /> ® ADMINISTRATION, MIAMI BEACH, FL <br /> ® Client: City of Miami Beach <br /> ® 1700 Convention Center Drive <br /> ® Miami Beach, Florida 33139 <br /> Joyce Myers <br /> ® Tel.: 305.673.7550 <br /> 9 <br /> ® Completion: 2003 <br /> ® Project Description: •:moi`- -I �-m -- <br /> ® Corradino was tasked to -work with the ^<(1 ':r <br /> ® North Shore neighborhood in developing jsss, ;• .,., -- <br /> appropriate urban design, context l3 <br /> s <br /> ® sensitive design and streetscape plans i ,` :It,- <br /> ® that would enhance the historic j 'p.•', ; .14 . �-; <br /> ® character of the neighborhood. This is , 1_, -:.- <br /> ® done with an Urban Design Review H,` Y._ern g y� <br /> ® Committee which contained experts from r� - t `7!!o 1 <br /> ® a variety of fields including Transportation ashy sJ 9e <br /> ® Planning, Urban Design, Urban Planning, _ ; ' as -e <br /> ®Traffic Calming, Engineering, -,••• . ,=,a; <br /> ® Architecture, and Construction _ El , y_ <br /> ® Management. l>r ' . c, I !iso e <br /> . 4'?' !_.;Qi•'"' i .--'e <br /> ® ® ,m comae <br /> ---_ <br /> Upon approval of the urban design plan, �`liesb� <br /> ® various elements will be sent to design. ' • <br /> - <br /> ® Design & Construction Documents' are reviewed by the Urban Design <br /> ® Committee eight times to assure the ihitiaLintegrity of the plan is maintained. <br /> ® The project then goes to bidding and construction. This effort coordinates a <br /> 0 myriad of disciplines from planning through implementation and coordinates <br /> ® them with city, council, and state agencies as well as the public. <br /> 9 <br /> 9 <br /> 9 <br /> 0 rnnn A fllkly 2-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.