My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® City of Sunny Isles Beach - RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ® FLAGLER STREET MARKETPLACE, MIAMI, FL <br /> 41 <br /> Client: Downtown Development Authority <br /> ® 330 Biscayne Boulevard - PH <br /> ® Miami, Florida 33132 A: ��r� <br /> Mr. Adorn Lukin 'f eW 0 <br /> 0 Tel.: 305.579.6675 j J <br /> uA_arrI D1A CSC <br /> ® Completion: 2005 <br /> 0 L <br /> ® Project Description: , <br /> ® Historically, Flagler Street was always lively and the center of activity in Miami. <br /> ® The Flagler Street Marketplace was planned as a rehabilitation of Downtown <br /> ® Miami's most prominent street, changing the character of the street and making <br /> ® it more pleasant for visitors. , <br /> ® -. <br /> ® This project included milling and resurfacing, context sensitive design, streetscape <br /> ® improvements consisting of decorative sidewalks and paving patterns, landscape <br /> ® enhancements, traffic signals, signing and pavement marking-s, and drainage <br /> ® improvements. The scope of the project also,included the conversion of Flagler <br /> ® Street from a one-way thoroughfare to a two-way road. In addition, parking <br /> ® garage locatipns werestudied and their importance to the success of the <br /> ® corridor was determined. Future parking garage locations were.suggested. <br /> f.® Ir (f 4 <br /> ® MIAMI HEALTH DISTRICT STREETSCAPE; GATEWAY, AND,SIGNAGE <br /> ® <br /> IMPROVEMENTS <br /> Client: /City of Miami -�Mara <br /> ® 444 SW 2nd. Ave. , - `9 r: <br /> $ Miami, FL 33130 - I - = <br /> ® Jose Gonzalez =.---=...7._ <br /> ® Tel.: 305.416.1092 j _ <br /> . I :1 -"- _�� <br /> Completion: 2008 jam! IL-4 Ij® i _ _ <br /> ® iL 1 1 � = <br /> ® Project Description: <br /> ® The Corradino project team conducted a comprehensive site visit and <br /> ® compiled extensive information on existing conditions including streets, <br /> ® sidewalks, land use, signage, landscaping, transportation and other elements of <br /> ® <br /> rnoo �I <br /> A rm.!fl 2-20 <br /> %..vrAr1tit vII ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.