Laserfiche WebLink
$ City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering &Transportation Consulting <br /> $ the urban fabric. The conditions were inventoried and summarized after <br /> ® thorough analysis. The signage was then broken up into several groups. These <br /> ® groups were Gateway signs, vehicular directional signs, primary and secondary <br /> ® facility signs, parking signs, pedestrian signs, information display signs and <br /> emergency signs. This information was then used to help the process of both <br /> ® replacement of signage as well as development of new signage. <br /> ® GENERAL PLANNING CONSULTANT, MIAMI DADE MPO <br /> ® <br /> Client Miami Dade County MPO <br /> ® 1 1 1 NW First Street, Suite 910, Miami'FL 33128 <br /> ® Jesus Guerra <br /> ® Tel.: 305-375-4507 <br /> 41/ <br /> ® Completion: 2009 <br /> 40 <br /> ® Project Description: <br /> In this contract, The Corradino Group provided a-variety of transportation planning <br /> ® services, These included services directly related to the implementation of the UPWP, <br /> TID and other Long Range/Data Collection and administrative tools. <br /> ® Corradino successfully provided services on- time, within budget-(exceeding its DBE <br /> requirement for this effort)which included: r <br /> (3 <br /> ® • Data Collection' `! <br /> • Travel Demand Forecasting <br /> ® • Analysis and Evaluation of • Corridor Studies <br /> ® Alternatives Preparation of Maps, reports, <br /> ® • Traffic Impact Analysis r and Presentations <br /> $ • Level of Service Determination • Freight Studies <br /> • Bicycle and Pedestrian Studies • Public Involvement <br /> 0 <br /> • <br /> ® ^.vInrti_#II 2-21 <br />