My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ® ©RR/WINO <br /> Mike Ciscar,PE(continued) <br /> ® northern Miami-Dade County. Project cost:$2.300,000.Construction cost:TBD. Start/Complete: <br /> ® <br /> 2010/2012 <br /> Reference: Ms. Mayra Diaz 305-637-3277 <br /> ® FDOT District 4 and 6, 1-95 Express PD&E Study, Project Manager for the preparation of a <br /> CE-11 for the implementation of two express lanes in each direction on 1-95 from 1-395 in Miami <br /> ® to Broward Boulevard in Fort Lauderdale.The Florida Department of Transportation(FDOT). in <br /> cooperation with local transit partners. developed a project to manage congestion and provide <br /> ® travel options in South Florida. The project, called 95 Express, was a combined Bus Rapid <br /> Transit/Managed Lane project. Existing lane and shoulder widths were slightly reduced so that <br /> ® an additional lane can be provided on 1-95 in each direction without expanding the corridor. The <br /> ® two existing High Occupancy Vehicle (HOV) lanes and two new lanes on Interstate 1-95 were <br /> converted to limited access Managed Lanes. The Managed Lanes can be used by 95 Express <br /> ® Buses.vanpools and registered car pools for free while other vehicles can use the facility by <br /> ® paying a variable toll. The toll rate will vary depending on the time of day so that the Managed <br /> ® Lanes can be free flowing—at approximately 50 MPH-at all times. The Managed Lanes provide <br /> a reliable option that is there for you when you need it. Project Cost: $1,500.000 Start/Complete <br /> ® dates:2007/2008 Reference:Mr. Kenneth Jeffries 305.470.6736 <br /> Mr. Richard Young, P.E.954-777-4323 <br /> ® FDOT District 6, 1-75 PD&E Study, Project Manager for the preparation of a CE-Il to add <br /> ® express lanes and/or general purpose lanes and modify interchanges on 1-75 from SR-826 to the <br /> ® Miami-Dade/Broward County line. Project Development and Environment Study for roadway <br /> and transit improvements to SR 93/1-75.Proposed improvements include the following elements: <br /> ® • The implementation of reversible lanes within the median. Access to and from the <br /> reversible lanes may be by either slip-ramps or special-use lane access ramps. with <br /> ® access control mechanisms: <br /> ® • Development of transitway (BRT)along the roadside of 1-75. The southern terminal <br /> station is proposed to be the Palmetto Metrorail Station(PalTran): <br /> ® • An Interchange Justification Report(11R)for a new interchange in north Miami-Dade <br /> County to be provided at either NW 154 Street or NW 170ih Street: <br /> ® • Restrict movement from 1-75 directly to NW 122od Street via SR-826. <br /> ® The proposed modifications include the addition of a new ramp movement from 1-75 running <br /> parallel to SR-826 but west of the existing southbound roadway overpassing NW 12je°Street and <br /> ® merging onto southbound SR-826 prior to NW 1034 Street.They also include a slip ramp from I- <br /> 75 to the existing frontage road south of 1-75 to provide access to NW I22ed Street. Project Cost: <br /> ID52.500.000 Construction Cost: Est. $5,700.000 Start/Complete Dates: 2007 — Ongoing. <br /> Reference: Dat Huynh, PE 305-470-5217(dat.huvnhr dot.state.fl.us) <br /> ID <br /> FDOT District 6, Krome Avenue South PD&E Study. Public Involvement Manager and <br /> Deputy Project Manager for the preparation of an Environmental Impact Statement (EIS) to <br /> ® widen Krome Avenue from two to four lanes in each direction. The FDOT was evaluating <br /> roadway and safety improvement alternatives along a 10-mile segment of SR 997/SW 177 <br /> ® Avenue (Krome Avenue) from SW 296th Street (Avocado Drive) to SW 136th Street (Howard <br /> Drive). The project corridor is located in South Miami-Dade County. Florida Additional <br /> ® improvements included drainage systems. bicycle and pedestrian facilities. signage. intersection <br /> ® improvements and other enhancements along the roadway. Krome Avenue is part of the Florida <br /> Intrastate Highway System (FIHS) and the Strategic Intermodal System (SIS). Project Cost: <br /> ® 51.300.000 Start/Complete dates:23302008 Reference: Monica Cejas.P.E 305.470.5217 <br /> 60 <br /> ® . 0000000000 . . . . . . . .,. 2 <br /> ® *sr Ut1%F'I#II v 3-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.