Laserfiche WebLink
® City of Sunny Isles Beach REQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ©fiRAD'NO <br /> Joseph M.Corradino,AICP(continued) <br /> $ and Transit Planning. Project Cost: S500,000. Start/Complete Dates: 2006/Ongoing. <br /> Reference: Steve Alexander 305.234.4262 <br /> ® Palmetto Bay Professional Services, Palmetto Bay,FL <br /> Principal in Charge Corradino is to provide the City with the following services: General Urban <br /> ® Planning Services to include but not limited to: comprehensive planting, land development <br /> aregulation, charrettes; neighborhood plans, and code enforcement regulations. General Traffic <br /> Engineering Services to include but not limited to: traffic counts and reports;traffic planning and <br /> ® surveys; and comprehensive traffic analysis, safety analysis, parking studies, traffic intrusion <br /> ® studies, and neighborhood traffic management. General Architectural and Engineering Services <br /> to include but not limited to: building renovations and/or alterations; facility design, and <br /> ® specifications; space planning; cost estimating; construction inspection/construction <br /> management; landscape design; and park facility master planning. Project Cost: Task Order. <br /> ® Start/Complete Dates: 2005/Ongoing. Reference: Meighan Pier 305.259.1234 <br /> ® MPO, GPC—Miami General Planning Consultant, Miami-Dade, Florida <br /> ® Principal—in-Charge: In this contract The Corradino Group provided a variety of transportation <br /> and planning services, on time and within budget for this effort. <br /> These included: <br /> ® > Data Collection <br /> ® > Analysis and Evaluation of Alternatives <br /> Level of Service Determination <br /> ® : Travel Demand Forecasting <br /> • Preparation of Maps, Reports,and Presentations <br /> > Public Involvement <br /> ® Project/Construction Costs: S400,000/NA. Start/Completion Dates: 2006/2009. Reference: Jesus <br /> Guerra <br /> ® 305-375-4507 <br /> ® FDOT District Six On-Site Planning Support Planning Offices, Miami, FL. <br /> ® Principal-in-Charge-Corradino provided on-site support to the District Six Planning Office via <br /> the placement of a qualified planner with certification from the American Institute of Certified <br /> ® Planners(MC)at the District Six Planning Office. Corradino staff functioned as an extension of <br /> FDOT Planning staff as directed to assist with the following tasks: <br /> • Growth Management and Land Development Reviews <br /> ® > Preparation of Reports and Presentations as required <br /> ® > Policy and Legislative Review <br /> • Metropolitan Planning Office Administration <br /> ® Project cost: S180,000. Start/Complete Dates: 2006/2008. Reference: Aileen Boucle 305-470- <br /> 5121 <br /> FDOT District 4 Districtwide General Planning Consultant, Systems Planning Support, <br /> ® Fort Lauderdale,FL <br /> Project Manager- The Corradino Group was selected as part of a team to assist FDOT District <br /> ® 4 in providing professional transportation planning services to supplement the FDOT District 4 <br /> Systems Planning staff as well as to serve as an extension to the FDOT District 4 Planning and <br /> ® Environmental Management Office. The primary tasks included: <br /> 40 o o o o o o o o o o • o o • • • • • •• 2 <br /> ® vvf1�fA-+vii��v 3-6 <br />