My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ® ` iiRAQiNO <br /> 0 Favio A. Laverde, PE <br /> $ Engineering Division Manager <br /> ® Experience <br /> 2001-Present <br /> ® The Corradino Group,Inc.: Engineering Division Manager. Mr. <br /> • <br /> ® Laverde's responsibilities include the design and production <br /> management of roadway plans for a number of FDOT projects,as - <br /> 0 well as Miami-Dade County and other municipalities. His experience <br /> O consists of roadway design, maintenance of traffic,signing and — =�' <br /> pavement markings,signalization,and drainage design. // <br /> ® He is also experienced in the design of sanitary sewer education <br /> ® systems and water distribution systems. Some of the Florida Intonational University.Miami.FL <br /> projects that Mr. Laverde has been involved with are: B.s.c.E.to/Honors)(2oop <br /> Florida International University, <br /> `® M.S.C.E.(2-003) <br /> FDOT District 6—RRR Project. SR 973(87th Ave.) <br /> ® from \Vest Flagler Street to NW 12th Street: Project Professional Affiliations <br /> Ameriam Society ofCivil Engineers <br /> ® Manager. Mr. Laverde currently supervises the design of Ton Bei Pi-National Engineering Honor <br /> the roadway and signalization improvements for the 87th <br /> Bodey <br /> ® Ave. corridor including, but not limited to,milling and Honorary and FraternalAraaatiora <br /> Cum Laude <br /> ® resurfacing, improvement of pavement markings, <br /> Jose vita Scholarship Award <br /> signalization design, and upgrading sidewalks and curb <br /> ® ramps to comply with ADA standards. Professional aegsiratrnns <br /> Cnil Engineer. <br /> 0 FDOT District 6—RRR Project. SR A1A (5th Street) Professional Engineer: <br /> Florida.No.63546 <br /> from West Avenue to Collins Avenue: Project Manager. <br /> Mr. Laverde currently supervises the design of the Advanced Work Zane Traffic Control <br /> ® Training <br /> roadway improvements for this corridor that includes <br /> 61 milling and resurfacing improvement of pavement <br /> markings, installation of count-down pedestrian signals <br /> ® and upgrading sidewalks and curb ramps to comply with ADA standards. <br /> ® FDOT District 6—SR 5(Big Coppit Key)from Shark Channel Bridge to Old Boca <br /> ® Channel Bridge. Project Manager. Mr. Laverde currently supervises the design of the <br /> ® roadway improvements for this corridor including,but not limited to,widening of the <br /> roadway in order to accommodate bicycle lanes,milling and resurfacing improvement of <br /> 5 pavement markings, and installation of an emergency signal. <br /> ® FDOT District 6—Constroctability Review. <br /> ® Mr. Laverde was responsible for reviewing construction documents for District 6 <br /> Construction. His duties included performing field reviews and assessing existing <br /> conditions to insure that the proposed improvements depicted in the plans were <br /> ® constructible. He also reviewed plans and other contract documents for errors and <br /> omissions in accordance with FDOT Standards and Specifications.Other responsibilities <br /> ® included verifying plan quantity items in the Final Computation Book and preparing <br /> ® Construction Schedules to estimate the number of work days for each particular job. <br /> (1 • • • • • • 1 <br /> 0 <br /> 0 <br /> ynfl oon^vII.11V 3-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.