My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> ® Girt RAD ANO <br /> Favio A.Laverde,PE(continued) <br /> Hialeah Miscellaneous Roadway Reconstruction Projects: <br /> As a design engineer, Mr. Laverde was responsible for assisting in the design;plans <br /> ® preparation and drainage report computations for the following City of Hialeah Roadway <br /> reconstruction projects: <br /> ® • East 26th Street from East 8th Avenue to East 10th Avenue <br /> • East 27th Street from East 8th Avenue to East 10th Avenue <br /> • East 28th Street from East 8th Avenue to East 10th Avenue <br /> • East 29th Street from East 8th Avenue to East 10th Avenue <br /> ® • East 30th Street from East 8th Avenue to East 10th Avenue <br /> ® • East 31st Street from East 8th Avenue to East 10th Avenue <br /> • East 33rd Street from East 8th Avenue to East 10th Avenue <br /> • West 27th Street from West 3rd Court to Palm.Avenue <br /> ® • West 28th Street from West 3rd Avenue to Palm Avenue <br /> • West 29th Street from West 3rd Court to Palm Avenue <br /> 410 • West 30th Street from West 4th Avenue to Palm Avenue <br /> • West 31st Street from West 4th Avenue to Palm Avenue <br /> ® FDOT District 6—SR 826/SW 8th Street Interchange Reconstruction. Design <br /> ® Engineer. Mr. Laverde was responsible for assisting in the design and plans preparation <br /> ® of the signing and pavement marking plans, as well as the drainage plans. <br /> ® University of Miami,Coral Gables, FL. Facilities Building Sanitary Sewer Connection. <br /> Mr. Laverde was responsible for preparing the pump station calculations and assisted in <br /> ® the design and development of the plans. He also supervised the construction and <br /> ® provided construction assistance. <br /> ® University of Miami,Coral Gables, FL. Sanitary Sewer Evaluation. <br /> Mr. Laverde was responsible for assisting in identifying sources of infiltration and inflow <br /> in order to reduce the amount of stormwater runoff conveyed by the system. He also <br /> ® assisted in providing cost effective rehabilitation and repair methods. <br /> FEM AJDORM Contracts <br /> ® As a design engineer, Mr. Laverde was responsible for assisting in the preparation of the <br /> drainage computations,and design packages for more than 45 projects. <br /> 0 <br /> • • • • o o o o o o o o o • • S • • • • • • •e 2 <br /> ® r►INoow3-8 <br /> lev. rXrNAvIIev <br />
The URL can be used to link to this page
Your browser does not support the video tag.