My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group - Traffic
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
The Corradino Group - Traffic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:40:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> City of Sunny Isles Beach • RFQ No. 12-04-02-Traffic Engineering & Transportation Consulting <br /> 110 <br /> CRRADINO <br /> Marvin Guillen,El(continued) <br /> ® minor drainage improvements, as well as upgrading pedestrian ramps to comply with <br /> ADA standards. <br /> Project Responsibilities: Project Engineer responsible for the overall design and <br /> 0 development of the roadway, maintenance of traffic, signing and pavement marking, and <br /> signalization plans. <br /> Reference: Ana T. Arvelo. P.E. —(305)470-5210 <br /> ® SR-826 Palmetto Expressway and SW 81° Street Interchange <br /> FDOT District 6 — FM No. 249649-1-52-01: The scope of this project consisted of the <br /> ® complete redesign of this major urban interchange, including reconstruction of the ramps <br /> and widening of SR 826 to six lanes in each direction. The project also included eight <br /> new bridges and a 12-foot wall to help reduce noise in the area. Controlling factors in this <br /> design were the close proximity of the Coral Gables Canal and the Tamiami Canal, and <br /> ® the limited available right-of-way for stormwater treatment and disposal. A complex <br /> 0 stormwater system was developed which combines infiltration swales and trenches, a <br /> stormwater network, exilltration trenches, retention basins, and overflow to the canals <br /> ® within the project. <br /> ® Project Responsibilities:: Project Engineer responsible for the geometric design, typical <br /> sections and development of the roadway, maintenance of traffic, signing and pavement <br /> ® marking and signalization plans. <br /> ® East 4t°Avenue from East 25th Street to East 32nd Street—Miami-Dade County <br /> ® City of Hialeah: The scope of this project consisted of complete reconstruction, including <br /> new drainage,signing and pavement markings, and lighting. <br /> Project Responsibilities: Project Engineer responsible for the overall design and <br /> ® development of the contract plans. <br /> Reference: Jorge Hernandez—(305)687-2611 <br /> a <br /> a <br /> 411) <br /> (10 <br /> e e o o o o o o o o s • 0 • s • • s • • • 2 <br /> S <br /> ® 1noo A num" 3-13 <br /> V V t EN IJ 11 \ V <br />
The URL can be used to link to this page
Your browser does not support the video tag.