Laserfiche WebLink
0 <br /> 0 <br /> 0 City of Sunny Isles Beach RFQ No. 12-04-02-Traffic Engineering &Transportation Consulting <br /> CRRADiltil-O <br /> 0 <br /> Juan A. Sotero, PE <br /> $ Project Engineer <br /> ® Experience <br /> 2005-Present <br /> The Corradino Group.Inc.. Miami,FL: Project Engineer Mfr.Sotero <br /> has 9 years experience in the field of Civil Engineering and Roadway <br /> Engineering and is a project engineer responsible for assisting in the design <br /> and production of roadway plans for a number of FDOT <br /> projects,as well as Miami-Dade County and other —7 <br /> municipalities.His experience consists of roadway design. /Education <br /> signing and pavement markings,signalization and drainage Florida huemational Unkasity.BS. <br /> ® design.In addition he assists project managers with pavement Civil Engineering(2001) <br /> design reports,typical section packages.and Design Exception FDOT Advanced Maintenance of Traffic <br /> and Variation reports. Course(20021 <br /> Prole-aianal Regis/abets <br /> Experience: Professional Engram-norida-No.613S6 <br /> FDOT District 6—RRR Project. SR A1A <br /> v (Harding/Abbott Avenue)from Indian Creek Drive to Professional Atfifations <br /> South of 75th Street(01/08 to Present) Arnaim society of CM Engineers(ASCE) <br /> ® The scope of this project consists of milling and resurfacing. Membershipswidening,ADA upgrades,drainage improvements, Menber of Chi Epsilon-Civil Engineering <br /> signalization enhancements,and upgrading the signing and National Honor Society <br /> pavement markings along the corridor. Ton au Alpha Enircanewl Fngmeame <br /> Project Responsibilities: Mr. Sotero serves as the Project Honorary <br /> 0 Engineer responsible for the design and plans development. <br /> Reference: PM Ana T. Arvelo.P.E..-(305)470-5210 <br /> FDOT District 6—RRR Project. (Coffins AlA Avenue)from iS Street to North of <br /> ® Lincoln Road (11/06 to 11/08) <br /> Mr Sotero was responsible for the design of the roadway improvements for this corridor that <br /> ®® included milling and resurfacing improvement of pavement markings,installation of count- <br /> down pedestrian signals and upgrading sidewalks and curb rumps to comply with ADA <br /> standards. Reference:PM:Una T.Arvelo. P.E..-(305)470-5210 <br /> FDOT District 6—RRR Project. SR 973(87th Ave.)from W. Flagler Street to NW 12th <br /> ® Street (10/OS to 11/08) <br /> The scope of this project consisted of milling and resurfacing widening ADA upgrades, <br /> drainage improvements,signalization and lighting improvements,and upgrading the signing <br /> ® and pavement markings along the corridor. <br /> Project Responsibilities: Mr. Sotero was responsible for assisting in the design and plans <br /> preparation of the signing and pavement marking plans,as well as the drainage plans. <br /> Reference:PM.Una T. Arvelo.P.E..-(305)470-5210 <br /> Miscellaneous Pushbutton Design Consultant Services(04/06 to 01/07) <br /> FDOT District 6—Project Engineer responsible for the design and development of <br /> 0 o 0 0 0 0 0 0 te • i . . . . • •. . 1 <br /> ® r•e nn A roper l 3-14 <br /> �..% 1% If%PIL/ 1111 <br />