Laserfiche WebLink
® City of Sunny Isles Beach • RFQ No. 12-04-02—Traffic Engineering & Transportation Consulting <br /> �`VRrWDiNO <br /> 0 <br /> ® Ryan Solis-Rios, PE, PTOE <br /> Project Development Engineer <br /> ® Experience <br /> 2005-Present <br /> The Corradino Group, Inc.: Project Development Engineer. Mr. Solis-Rios' - <br /> ® area of expertise is planning and project development. He has worked on <br /> ® multiple MPO work orders and has lead the 137th Avenue Corridor Study <br /> and the US-1 Reversible Lanes Study. As a former District 2 FDOT project \Tr/ <br /> 0 manager. Mr. Solis-Rios has worked and finalized many Planning and Project <br /> Development and Environment (PD&E)studies which include® - - - ,'five interchanges on freeway systems,six principal arterial �Ednra5m <br /> ® widening projects, and four FIHS/SIS facilities. He brings a Bradley University Peoria B.;BS.(Civil <br /> Engineaine)(1998) <br /> ® significant perspective by being involved with the initial project <br /> development phases and construction management. Professional RegistraCm <br /> Reeistered Professional Enemecr Florida No. <br /> ® 63345 <br /> • Performs Project Development and Environment Studies New Hampshire No.a Vb <br /> ® (PD&E). <br /> ® • Performs traffic analysis. Responsible for setting number of lanes, typical sections, <br /> intersections and interchange layouts for rural and urban roadways. <br /> O • Analyzes and develop alignment alternatives for complex highway improvement projects. <br /> ® • Selection and analysis of various typical section alternates for proposed facilities. <br /> • Responsible for reviewing,producing and evaluating work effort to assure the <br /> ® preliminary'engineering and environmental documentation is prepared in accordance to <br /> 0meet AASHTO and NEPA standards. <br /> • Generates project costs estimates including engineering cost,construction cost,right of <br /> ® way cost and maintenance cost. <br /> ® • Development of design presentation for public meetings, elected officials and citizens by <br /> providing the necessary information to assure the public is sufficiently informed on the <br /> ® proposed improveme <br /> Project Experience <br /> ® FDOT District 4 and 6,1-95 Express PD&E Study Miami Florida <br /> ® Project Engineer for the preparation of a CE-II for the implementation of two express lanes <br /> in each direction on 1-95 from I-395 in Miami to Broward Boulevard in Fort Lauderdale. The <br /> ® Florida Department of Transportation(FDOT), in cooperation with local transit partners, <br /> developed a project to manage congestion and provide travel options in South Florida. The <br /> I® project,called 95 Express,was a combined Bus Rapid Transit/Managed Lane project. <br /> ® Existing lane and shoulder widths were slightly reduced so that an additional lane can be <br /> provided on 1-95 in each direction without expanding the corridor. The two existing High <br /> ® Occupancy Vehicle(HOV)lanes and two new lanes on Interstate 1-95 were converted to <br /> ® limited access Managed Lanes. The Managed Lanes can be used by 95 Express Buses, <br /> vanpools and registered car pools for free while other vehicles can use the facility by paying <br /> ® a variable toll. The toll rate will van'depending on the time of day so that the Managed <br /> Lanes can be free flowing—at approximately 50 MPH -at all times. Project Cost: <br /> ® o 0 0 0 0 0 0 0 0 0 0 i • • • • • • •• <br /> ® ^nit n A miwme% 3-19 <br /> �.+vFArXflv1II <br />