Laserfiche WebLink
0 <br /> ® City of Sunny Isles Beach • RFQ No. 12-04-02—Traffic Engineering & Transportation Consulting <br /> O <br /> ® L�@rcewDi►ii0 <br /> Ryan Solis-Rios,PE,HOE(continued) <br /> ® S1,500,000 Start/Complete dates: 2007/2008 Reference: Mr. Kenneth Jeffries 305.470.6736 <br /> Mr. Richard Young P.E. 954-777-4323 <br /> ® FDOT District 6 Interstate 75 Project Development& Environment Study,Miami, FL <br /> Project Engineer- Project Development and Environment Study for roadway and transit <br /> ® improvements to SR 93/1-75. Proposed improvements include the following elements: <br /> ® • The implementation of reversible lanes within the median. .Access to and from the <br /> ® reversible lanes may be by either slip-ramps or special-use lane access ramps,with <br /> access control mechanisms; <br /> ® • Development of transitwav(BRT)along the roadside of 1-75. The southern terminal <br /> station is proposed to be the Palmetto Metrorail Station(PalTran); <br /> • An Interchange Justification Report(IJR)for a new interchange in north Miami-Dade <br /> ® County to be provided at either NW 154 Street or NW 170th Street; <br /> • Restrict movement from I-75 directly to NW 122vd Street via SR-826. <br /> ® The proposed modifications include the addition of a new ramp movement from 1-75 running <br /> ® parallel to SR-826 but west of the existing southbound roadway overpassing NW 122°d Street <br /> ® and merging onto southbound SR- <br /> 826 prior to NW 103rd Street. They also include a slip ramp from 1-75 to the existing frontage <br /> ® road south of I-75 to provide access to NW 122°d Street. Project Cost: 52,500,000 Construction <br /> Cost: Est. $5,700,000 Start/Complete Dates: 2007—Ongoing. Reference: Dat Huvnh. PE 305- <br /> 470-5217(dat.huvnh@dot.state.fl.us) <br /> ® FDOT District 6 SR-997/Krome Avenue Project Development and Environmental Study, <br /> Miami, Florida. <br /> ® Project Engineer-The study was to address improvements to the existing facility preparation of <br /> ® an Environmental Impact Statement(EIS)to widen Krome Avenue from two to four lanes in <br /> each direction. The FDOT was evaluating roadway and safety improvement ahematives along a <br /> ® 10-mile segment of SR 997/SW 177th Avenue(Krome.Avenue)from SW 296th Street(Avocado <br /> Drive)to SW 136th Street(Howard Drive). The project corridor is located in South Miami-Dade <br /> ® County. Florida Additional improvements included drainage systems, bicycle and pedestrian <br /> ® facilities,signage, intersection improvements and other enhancements along the roadway. <br /> Krome Avenue is part of the Florida Intrastate Highway System(FIHS)and the Strategic <br /> ® Intermodal System(SIS). Project Cost: 51.300.000 Start/Complete dates: 2004/2008 Reference: <br /> ® Monica Cejas, P.E 305.470.5217 <br /> ® Other Project Experience: <br /> ® • 137th Avenue Corridor Study(Miami-Dade MPO) <br /> ® • US-1 Reversible Lanes Study(Miami-Dade MPO). <br /> • SR-70(Okeechobee Road)PD&E Study(District 4) <br /> ® • 1-75/US 441 (Alachua Interchange)PD&E/IMR Study(District 2) <br /> ® 1999-2004 <br /> ® Florida Department of Transportation District 2, Lake City, FL.: Project Manager. <br /> • Performed Project Development and Environment Studies(PD&E). <br /> ® e o 00000000Oo • • S • Sti•• 2 <br /> ® <br /> ,--est If)to A rlIwIr% 3-20 <br /> VV n f1 P-1 LI II \ V <br />