|
•
<br /> •
<br /> •
<br /> •
<br /> •
<br /> •
<br /> Cha
<br /> • Berrnello Ajamil E. Partners,Inc.
<br /> • Society of American Registered Architects
<br /> • Professional Design Award, 2008
<br /> • l.A�f O•.� / I .iI t.`.{ri.,_ 'b''I MINI UI..fl.
<br /> •
<br /> .--,----- - ,„--,--„,,,--,--
<br /> •
<br /> ibih„....7
<br /> ins°
<br /> in
<br /> • ow*".;...‘
<br /> � .vai <
<br /> • y a �,k ARAGON AVENU ••
<br /> -411Lttik .-da
<br /> C40 3,�I'C ,/,,.
<br /> L7.1S:, ail u:�i ~ --Y�r`��i -1,7 caasi�"'w0i ::e!:r; a :-' - I0
<br /> • �'kow'r�r:.`.a.i– it - - . )� t_.-�, — /I{` r-!/1,- �/� _
<br /> • 4ez 40'I T
<br /> • t _.S. �- . ' .Ltt MTIC4 —avv—ac _ .. — �' ill I
<br /> I writ
<br /> • 1 O0 DaI .
<br /> irlil
<br /> •
<br /> 1 •• •� •: •
<br /> • ,: :
<br /> 1,1 11,- • i,
<br /> • ,. r Ilima I
<br /> ".". LN.I, ........ l r
<br /> . •
<br /> _ 1 91
<br /> � �
<br /> • ,,,'• .��emD .. n,,I k.....L-1-! \I '•I %li.„� 1 t f.: ,r
<br /> • 11
<br /> •
<br /> f T
<br /> i
<br /> II 13.114 a.. I
<br /> • . . I,41.11 ALLEI'
<br /> it'llitt
<br /> • , Li ._ • ,
<br /> • - 1 �
<br /> •
<br /> • Museum Parking Garage & Aragon Berrnello Ajamil & Partners, Inc. (B&A) was Prime Consultant for
<br /> Avenue Sheetscape Improvements the City of Coral Gables with regard to this parkin° garage and
<br /> • Coral Gables. Florida streetscope project, providing full architecture and landscape
<br /> • architecture design and civil enaineerina services.
<br /> • Size: 633 parking spaces
<br /> • 8 levels with ground floor retail Our Civil Engineering Team provided design, permitting. project
<br /> • Cost: $12 Million management and construction administration for the onsite
<br /> Completion:2005 water, sewer, paving, grading and drainage, as well as the of
<br /> •
<br /> roadway reconstruction, streetscape, drainage improvements
<br /> • and offsite water main extension for Aragon Avenue from Ponce
<br /> • de Leon Boulevard to LeJeune Road. Aragon Avenue included
<br /> • full reconstruction of the roadway, sidewalk, landscaped islands,
<br /> • crosswalks and drainage reconstruction. The team provided value
<br /> engineered material alternatives in their design, keeping costs
<br /> •
<br /> down while remaining code compliant.
<br /> •
<br /> •
<br /> •
<br /> • 23
<br />
|