Laserfiche WebLink
0 <br /> • <br /> 0 <br /> 0 <br /> Cba• <br /> • Bermello Ajamil & Partners,Inc. <br /> • <br /> • 1`, <br /> • <br /> • ys <br /> 0 or <br /> ® • t . IIS : <br /> 1 s;, , r <br /> d •w�� 1 <br /> • o y � .z_ + \r 2 <br /> - "• <br /> - <br /> • <br /> • <br /> 1• J fp :4 :1 _ '4,- ,,x c i x , 'i �0 _ _ Th t -4n ,-r <br /> • <br /> I &' jtt <br /> _• _l r <br /> � c ../ <br /> • <br /> • <br /> • N.E. 188th Sheet Bermello Ajomil& Partners,Inc. (B&A) provided engineering design, <br /> • permitting, project management and construction administration <br /> Roadway Widening, Sheetscape <br /> • services for this roadway reconstruction project that entailed <br /> O <br /> & Drainage Reconstruction converting a 'A mile of a 2-lane roadway into a 4-lane divided <br /> Aventura, Florida roadway. The roadway improvements included new paving, <br /> • grading and streetscape improvements such as curb and gutters, <br /> • Client: City of Aventura sidewalks, landscaping, street lighting, striping and signage. <br /> • Completion: 2003 The reconstruction also included a new stormwater drainage <br /> Cost: $1.5 Million system that consisted of interconnected exfiltration trenches and <br /> • emergency outfall to the inter-coastal waterway and new water <br /> • service mains from N.E. 29th Avenue. <br /> • The Civil Engineering Team manaced all permitting activities for <br /> • this project through local County and City government public <br /> • works, water and sewer management authorities and assisted <br /> • the City in obtaining grant funding from South Florida Water <br /> Management District,which funded half of the construction cost. <br /> • Value encineered material alternatives brought construction <br /> • costs down and kept the project under budget. Efficient design <br /> and permitting allowed construction to commence and end <br /> • ahead of schedule. 28 <br /> • <br />