Laserfiche WebLink
• <br /> • <br /> O <br /> o r---ba <br /> • <br /> • \ , <br /> • Bermello Ajamil & Partners,Inc. <br /> • <br /> • <br /> ® •NR ry}34. :, SiOP J '_�t 4xia : 21..5 . I.. 1 <br /> -1 a._t� ... r • <br /> • sm• :.w . �,�. ".. — � ri'eiry X�.-w - • "Aq.l+ iiV ;'•,. <br /> i� ...`mow",�Ir.:—" 4 ,0 • .`{.i �f , 1 nNaui tit` i,��J <br /> • C .•Cr- r %v•rf _ _ <br /> ! i I �1 <br /> .--...c.4.- ... .namii .. .71., __ _ i4 164. 1:44 <br /> -• 'e 'Midi <br /> • ; , <br /> • <br /> •.- <br /> o *- <br /> 42-3c.tit <br /> • ra._ en _ <br /> • <br /> ..xa 'rt' :. a <br /> • • ti <br /> - ° <br /> 0 <br /> 0 <br /> • Washington Park Actino as the Prime Consultant, B&A's Civil Engineering and <br /> • Landscape Architecture Groups handled design, permitting, <br /> Roadway Reconstruction <br /> • North Miami Beach, Florida project management and bidding assistance to the City of North <br /> • Miami Beach for this 2-mile roadway reconstruction project. <br /> • Client: City of North Miami Beach <br /> • Completion: 2004 B&A also provided construction administration services, including <br /> • Cost: $2 Million inspections, testing and final certification. This involved drainage <br /> improvements which merged an existing storm drainage system <br /> • with a newly designed one, new extltration trenches and deep <br /> • wells and elimination of a Flood-prone low-lying residential area. <br /> • <br /> • To help beautify and more effectively use the narrow right-of-way. <br /> • B&A redesigned the sidewalks, pedestrian crosswalks, on-street <br /> parking and landscape. B&A completed this design on time, to the <br /> • <br /> satisfaction of the neighboring property owners,and within budget. <br /> • <br /> • <br /> • 29 <br /> • <br /> a <br />