Laserfiche WebLink
• <br /> • <br /> 0 <br /> O Kr:a• <br /> • <br /> • Bermello Ajamil & Partners,Inc. <br /> • <br /> • <br /> • I & . ; r� -‘ -iv- _ <br /> ® �� P Lill <br /> • <br /> • <br /> • , -0,10 II <br /> • ii K , ' <br /> • IiE. i. F-' y ..1 <br /> eEfR� ` �y�pY _ <br /> • 1tf r^'6® u b-et �7�{ ® ,� ia"�. r,ipr� f `\YJ t-I r I <br /> • <br /> -.-'• ,..1 '-s_ - - il'�l"l _tri t t j J I-41 �i� --;e.'„,. 1111111 .LCk r. f et, , <br /> _ r _ y 1. ry� r\ aC. <br /> .SIS 4 <br /> • <br /> • _ --=-e ti <br /> , <br /> • _ _ �. <br /> ' 4 .c . ; i <br /> • r�t'`ara � i } <br /> f <br /> • 4. � _ - <br /> 0 .va <br /> ® - ` . r '�_j <br /> • <br /> • 1�► <br /> +j <br /> • V alp i _ ;,..tee 't - j - ' ' ._ . . . <br /> • <br /> ® SR 922/N.W. 125 St. from East of N.W. Bermello Ajamil &. Partners, Inc. served as prime consultant for <br /> ® 7th Avenue - West of N.E. 9th Avenue the Resurfacing, Restoration and Rehabilitation (RRR) project on <br /> ® Miami, Florida S.R. 922, a 4-lane undivided arterial. Roadway work included <br /> • the milling and resurfacing of the existing asphalt pavement, <br /> • Client: Florida Department of improvements at each intersection in order to provide standard <br /> • Transportation, District VI pedestrian ramps complying with ADA requirements and <br /> • Construction Cost: $2.5 Million of all driveways within the projects limits. Upgrades <br /> Completion: 2004 to six existing signalization spun wire systems consisted of installing <br /> • new most arms, including a mid-block pedestrian crossing. Some <br /> • small tree removal was required. <br /> • <br /> • At Bridge No.870671 over the Canal C-8, the scope of this project <br /> • included the replacement of the existing substandard railing. <br /> A new aluminum pedestrian and bicycle roiling was added, os <br /> • <br /> well as a new traffic railing barrier. Pavement markings and signs <br /> • were also upgraded. <br /> • <br /> • <br /> • 31 <br />