Laserfiche WebLink
O <br /> O <br /> ! Coa <br /> O Bermello Ajamil & Partners,Inc. <br /> 9 <br /> 0 <br /> • 7' i <br /> • <br /> M <br /> • <br /> O !J <br /> � w j 7 <br /> 9 gra _. <br /> ♦ c�%aLY t ♦, <br /> { _ <br /> ® 1 ♦ { ` a 2 Vs'- r4- J <br /> ® A' LC A a ` .. � � s- f fl) - �� lirst� 1 <br /> O � '4 .. 'ii .v,- "s s it <br /> ca_ <br /> O - - a`„._S _ _tt - -- <br /> ® ! _ -rte .. �-�; - <br /> ® w. - - - <br /> 0 ,t <br /> 0 v, <br /> y <br /> ® -� • / �.. fz <br /> _ <br /> 8 <br /> ® i aP <br /> O <br /> O <br /> ® S.R. 922/N.E. 125 St./123 St. Bermello njamil & Partners. Inc. designed safety improvements for <br /> ® from West of N.E. 9 Avenue to this corridor of S.R.922,a 5-lane undivided arterial, based on safety <br /> • East of Biscayne Boulevard enhancements. Many of the existing trees and light poles were in <br /> ® Miami, Florida close proximity to the roadway, resulting in numerous accidents <br /> 9 along the corridor. In order to correct this problem, all light poles <br /> • Client: Florida Department of <br /> were removed and new assemblies were installed at the back of <br /> ® Transportation, District VI the sidewalk. <br /> Cost:$540.000 <br /> ® Completion: 2006 In addition to posing a safety hazard, the existing trees were <br /> • uplifting sidewalks as well as the curb and gutter. This resulted <br /> ® in drainage problems, leading to water ponding. New trees with <br /> ® non-aggressive roots were planted at the back of sidewalk and <br /> ® root barriers were installed to prevent reoccurrence. <br /> 0 <br /> 0 <br /> 0 <br /> 0 32 <br /> A <br />