|
•
<br /> •
<br /> •
<br /> •
<br /> •
<br /> •
<br /> •
<br /> • .- _-_ Luis Ajamil, P.E.
<br /> • President, CEO
<br /> •
<br /> • Professional Experience
<br /> • Luis Ajamil is President and CEO of Bermello Ajamil& Partners.Inc..an award-winning international
<br /> '._\ multidisciplinary design firm. Under his leadership, B&A has expanded its worldwide presence to
<br /> • �' •' become one of the preeminent firms in its field.A consummate visionary who believes in providing
<br /> • .. . :.� service on a global scale. Mr. Ajamil strategically expanded operations to include B&A offices
<br /> • ' 5�°3 across the United States from Florida to California and abroad in Dubai-embracing the opportunity
<br /> • to serve that burgeoning market.Mr.Ajamil is a Planner and a Professional Engineer with a variety
<br /> � ' f
<br /> of experience ranging from innovative master planning projects to waterfront developments to
<br /> • transportation and engineering related projects.
<br /> RELEVANT EXPERIENCE
<br /> • Miami-Dade Expressway Authority (MDX) General Engineering Consultants, Miami, Florida - Mr.
<br /> • Ajomil was Principal in Charge for a joint venture team serving MDX as their General Consultants.
<br /> • Projects under planning and design stages included:SR 836 interchange.LeJeune Road interchange
<br /> with Miami International Airport,Miami Intermodal Center(MIC),and SR 112,including the planning
<br /> • EDUCATION and design of the SR 836 to Central Parkway interconnector;SR 836 westward extension to NW 137th
<br /> • Bachelor of Science in Avenue,and interchange with Florida's Turnpike,with provision for toll plazas;SR 112 improvements
<br /> Civil Engineering,
<br /> • University of Florida, 1972 and connections to Miami International Airport and Miami Intermodal Center. Also under planning
<br /> • stages were projects,which include provisions of Long Range Express Lanes or Value Pricing Lanes
<br /> along SR 836 from Florida's Turnpike to the Miami Intermodol Center and the Miami International
<br /> • REGISTRATION Airport,this includes approximately 8 miles of expressway reconstruction,with four interchanges.
<br /> • Registered Engineer
<br /> • State of Florida, 1974 Margaret Pace Park, Miami, Florida - Principal in Charge; directed project team that provided
<br /> Reg.No.0018e20 programming, master planning, schematic design, design development and construction
<br /> • documentation for this waterfront regional urban park.Park includes 4 tennis courts.2 soccer fields,
<br /> • PROFESSIONAL AFFILIATIONS tot-lot and children's play equipment,vita course,street and water oriented urban plazas,waterfront
<br /> • Greater Miami Chamber promenade,shoreline stabilization,picnic shelters,security lighting and landscape improvements.
<br /> • of Commerce
<br /> Lummus Park, Miami Beach, Florida - Project Manager; This project marked the first reconstruction
<br /> • Leadership Florida American of Lummus Pork along Ocean Drive in South Beach.The park was the fu-st project involving shifting
<br /> • Association of Port Authorities Ocean Drive toward the east to create the larger sidewalks along the west side of Ocean Drive.
<br /> • Florida-Caribbean Cruise This made possible the resurgence of Ocean Drive as one of the most successful people-gathering
<br /> places in all of Florida.The linear pork then involved creating meandering wide sidewalks designated
<br /> • Association,Platinum Member
<br /> as both bikeways and roller skate zones separate from pedestrian areas.
<br /> •
<br /> • Harry S. Truman Presidential Park, Key West. Florida - Principal in Charge for a 23-acre waterfront
<br /> • master plan.The park incorporates a 50-foot-wide waterfront promenade,on open air amphitheater,
<br /> a Turtle Rescue Hospital, a 15,000-SF event plaza with tent structure, a renovated Navy Generator
<br /> • Plant to be reused for a restaurant and historical museum, a dockmaster facility, an interactive
<br /> • water feature, exercise trail,outdoor zoological exhibits,a ferry terminal,a 60- boot marina,fishing
<br /> • pier and a new recreation complex for the adjacent residential community of Bahama Village.
<br /> • South Beach Park, Miami Beach, Florida - Project Manager for the transformation of fallow Federal
<br /> • property in the first South Beach park.The pork included a tensile structure bandstand,horse stables
<br /> • and multi-purpose lawn with utility modules to allow outdoor art shows and festivals.This park was
<br /> • developed in anticipation of the renaissance of South Beach and the introduction of high-rise
<br /> residential developments along its perimeter. The master plan also included sites for a restaurant
<br /> •
<br /> (since built), parking and a connection of the then-existent fishing pier.
<br /> •
<br /> • Turnberry Isle Yacht Club, Aventura. Florida - Project Manager for Turnberry Isle Yacht Club
<br /> • development in Aventura, Florida.This project, part of the Aventura complex,involved three major
<br /> condominium towers, yacht club, country club, and marina. Mr. Ajamil was responsible for the
<br /> • design of all land development programs including bulk heads, grading, drainage, paving, and
<br /> • utilities. Mr.Ajamil was also responsible for utility systems designed to serve the Fl, F2, F3, F4 and F5
<br /> •
<br /> Cba > www.berrnelloajamil.com
<br /> as
<br /> 0
<br />
|