Laserfiche WebLink
• <br /> • <br /> 0 <br /> O <br /> O <br /> O <br /> O <br /> Gerardo Dragoni <br /> • Civil Engineering Designer / Senior CADD Technician <br /> I <br /> • rural road to a four-lane section with a shared-use median, curb & gutter, and sidewalk. Primary <br /> • responsibilities included production of project set of Signing and Pavement Marking. <br /> • SW 268/264 Sheet Connector, Miami-Dade County Public Works Department, Florida - Project <br /> consisted of the improvements to SW 268th Street from a 4-lane undivided section to o 5-lane section <br /> • from SW 142nd Avenue to SW 122nd Avenue with a two-way left turn lone and a 4-lane divided <br /> section with a median separator from SW 122nd Avenue to SW 112th Avenue.Primary responsibility <br /> • included the production of project set of Signing and Pavement Marking. <br /> • <br /> • FDOT District 6, SR-823 (Red Road), Miami, Florida - Drainage design of 2.1 Miles of Roadway. <br /> • Drainage services includes hydrology and hydraulic calculations;water quality and water quantity <br /> permitting calculations;and pre-development and post-development drainage modeling;as well <br /> • as environmental permitting through DERM and SFWMD for 2.1 miles of Bird Road canal drainage. <br /> • As a land surveyor. Mr. Dragoni supervised, trained and assisted the field crew for data collection <br /> • (TOPO)on several side streets emptying out to NW 57th Avenue. As a Cadd Technician his primary <br /> • responsibilities included partial of drainage design in the pre and post-development. <br /> • 72"RWM,Miami.Florida-Mr.Dragoni served as the Senior Design responsible for assisting in the preparation <br /> • of Site plan.Paving,Grading and Drainage Water and Sanitary Sewer collection system.utilities collection, <br /> • Opinion Cost Estimates.Create setup for the project,Drainage Structures and Profiles. <br /> • 36 Inch Reuse Water, Miami, Florida - Senior Designer responsible for assisting in the preparation of <br /> • Construction Estimates.Aerial Pictures using Descartes,Create profiles,Typical Sections. <br /> • Proposed 42-inch Water Line along Candle shade, Jorns,and W. Orem in Houston,Texas- Assisted <br /> • with the design. which included plan and profile of proposed waterline, standard details, notes, <br /> • calculations.etc.A combination of AutoCAD 2006 and MicroStation V8 was used for this project. <br /> • <br /> Cover Ranch.George Park,North Broward,Tradewood,CB Smith,Markham,Osswald Park,Broward <br /> • County, Florida- Engineering Technician. Responsible for assisting in the CADD production of Plan. <br /> • Prepared Utility Adjustment sheet, Profiles for sewer and water, prepared the plans and Pavement <br /> • and Grading plans. <br /> • Pod of Miami Cruise Terminals D & E, Miami, Florida -Civil Engineering Designer. Repairs, upgrades <br /> • and new construction for Cruise Terminals 'D'and 'E'.This project is a fast track project.Responsible <br /> • for all civil engineering design and development of construction documents for the demolition of <br /> • existing facilities; modification to traffic flow patterns; relocation of existing utilities; water supply & <br /> distribution;sewer collection;stormwater collection; road&parking lot layouts;paving,grading,and <br /> • <br /> drainage for paved areas including sidewalks & pedestrian pathways; permitting with regulatory <br /> agencies;Services during project bidding,award,&construction;and final certification to regulatory <br /> • agencies. <br /> • Altos de Cuervo Master Plan, Tequila, Jalisco, Mexico - Civil Engineering Designer. Master Plan of <br /> an 850-acre Greenfield site proposing the development of an 18-hole golf course, an equestrian <br /> • center,single family home,and tourism oriented facilities.Responsible for all civil engineering design <br /> • and development of construction documents for the demolition of existing facilities; modification <br /> • to traffic flow patterns; relocation of existing utilities; water supply & distribution; sewer collection; <br /> stormwater collection; road & parking lot layouts;paving,grading,and drainage for paved areas <br /> including sidewalks & pedestrian pathways; permitting with regulatory agencies; Services during <br /> • project bidding,award,&construction;and final certification to regulatory agencies. <br /> I <br /> I <br /> S <br /> Cba > www.bermelloajamil.com <br /> • 52 <br /> • <br />