Laserfiche WebLink
• <br /> O <br /> O <br /> 0 <br /> 0 <br /> O <br /> • Francisco J. Tejidor, P.E. <br /> • Senior Associate, Geotechnical Engineer <br /> • <br /> O Professional Design Experience <br /> OFrank Tejidor hos more than 28 years of experience in geotechnical and civil engineering. He served <br /> v' _y for more than 10 years as the District Geotechnical Engineer for Florida's Turnpike. He was responsible <br /> • J .3- for the design management of the entire geotechnical program for the Turnpike District and the <br /> f' r supervision of construction related issues. Previously,he was lead technical professional for bridge and <br /> • T- 1' roadway design in the Program Management of the Orlando-Orange County Expressway Authority <br /> • <br /> WJ' <br /> and the Palmetto Expressway Improvement Program. Additionally, he has been involved in projects <br /> with foundation underpinning of historic and multi-story buildings. installation monitoring of in-situ <br /> • �l testing of pressure injected tiebacks.design of belled drilled shafts over deep compressible material, <br /> • instrumented pile load test,and construction monitoring and field testing of a multi-story slurry wall. <br /> • RELEVANT PROJECT EXPERIENCE <br /> • SR 874 Roadway Improvements, Miami-Dade Expressway Authority (MDX), Miami, Florida - QA/ <br /> • QC Geotechnical Engineer for the widening of the Don Shula Expressway. Geotechnical design <br /> management and construction supervision for project retaining walls, noise walls, roadway <br /> • EDUCATION widening,and bridge foundations. As lead technical professional,responsible for the management <br /> • Master of Science in Civil and supervision of the geotechnical program for MDX. Responsibilities include the technical review <br /> Engineering-Geotechnical <br /> • Engineering.Purdue University, and approval of all geotechnical explorations and design recommendations. <br /> • 1984 <br /> Central Boulevard,Miami-Dade Expressway Authority(MDX),Miami,Florida-QA/QC Geotechnical <br /> • <br /> Bachelor of Science in Civil Engineer for the improvements to the entrance to the Miami International Aiprort. Geotechnical <br /> • Engineering,University of design management and construction supervision for project retaining walls,noise walls,roadway <br /> • Miami, 1979 widening,and bridge foundations. As lead technical professional,responsible for the management <br /> • and supervision of the geotechnical program for MDX. Responsibilities include the technical review <br /> REGISTRATION and approval of all geotechnical explorations and design recommendations. <br /> • Professional Engineer. <br /> • State of Florida-No.38847 Design-Build of the MIA Mover Automated Train System, Miami-Dade Aviation Deportment, <br /> • Florida - Lead Technical Professional for geotechnical engineering services on this $259 million <br /> Professional Engineer, design-build project with responsibilities to ensure that design-build contractor complies with the <br /> • State of North Carolina foundation and geotechnical related contract requirements as well as MDAD's standards and <br /> • Professional Engineer, project approved plans and specifications. Responsibilities included plans review,design support. <br /> • State of South Carolina on-site construction support,and oversight review of RFI's and shop drawings. <br /> • Professional Engineer, SR 836 Expressway Extension,Miami-Dade Expressway Authority(MDX),Miami,Florida-Geotechnical <br /> • State of Alaska Engineer for the extension of the primary East/west Expressway system of Dade County. Florida. <br /> • Geotechnical design management and supervision for project retaining walls,high fill embankments, <br /> roadway improvements, and bridge foundations. As lead technical professional, responsible for <br /> • PROFESSIONAL AFFILIATIONS the management and supervision of the geotechnical program for MDX. Responsibilities included <br /> • International Society of Soil <br /> Mechanics and Foundation the development of the scope of work, negotiation of subconsultant contracts,and the technical <br /> • Engineering review and approval of all geotechnical explorations and design recommendations. <br /> • American Society of Civil SR 826/SR 836 Expressway Widening, Miami-Dade Expressway Authority (MDX), Miami, Florida - <br /> • Engineers Geotechnical Engineer.Project involved the design and construction monitoring of a soil stabilization <br /> • Deep Foundations Institute system based on MDX design/build guidelines. The purpose of the soil stabilization system was to <br /> • serve os a transfer mechanism for the bearing support of high fill embankments and retaining walls <br /> • Notional Society of Professional over weak subsurface soils. The soil stabilization system included a load transfer platform consisting <br /> • Engineers of high strength geogrids and in-situ concrete displacement piles. Responsibilities included the <br /> review and approval of design documentation, shop drawings, establishment of field testing <br /> • criteria for load tests.construction monitoring,and approval of final product. <br /> • <br /> Walt Disney World, Bridge Inspection Program, Orlando, Florida - Directed and supervised the <br /> • bridge inspection program for the entire Disney World complex. The work included review of <br /> • existing record drawings and performing load ratings on selected bridges. A wide selection of <br /> • bridge types were inspected,including pedestrian bridges. <br /> • Cba D www.bermelloajomil.com <br /> • 53 <br /> • <br />