My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil - Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Bermello Ajamil
>
Bermello Ajamil - Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:42:20 PM
Creation date
2/2/2016 2:42:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> • <br /> • Francisco J. Tejidor, P.E. <br /> • Senior Associate, Geotechnical Engineer <br /> • <br /> • Orlando-Orange County Expressway Authority,Program Management,Orlando,Florida-Directed <br /> • and supervised the design reviews of expressway structures(bridges,retaining walls,culverts,etc.). <br /> developed structures design criteria, and technical resolution of issues with section designers and <br /> • subconsultants. <br /> • <br /> • Public Boat Ramps Engineering Project for the Florida Keys,Monroe County,Florida-Project Engineer. <br /> Engineering design services for the repair and upgrades to six public boat ramp facilities in the Florida <br /> • Keys.All of the boat ramps were showing disrepair,and many did not meet current design standards <br /> • and criteria.Project included civil and structural engineering services,land surveying,geotechnical <br /> • work,and environmental permits for the six boat ramps.The structural design of the ramps and the <br /> • adjoining seawalls,and mooring facilities were design and permitted by Mr.Tejidor's team. <br /> • Key Haven/SR 5 Seawall and Boat Ramp, Monroe County, Florida - Project Manager for <br /> reconstruction of the boat ramp and associated access improvement on State Road 5/Overseas <br /> • Highway. The reconstruction included a new concrete boat ramp, a bulkhead wall designed to <br /> resist erosion from consistent and repeatedly heavy wave action caused by a hurricane event. <br /> • and a cantilevered retaining wall adjacent to US-l. <br /> • <br /> • Port Everglades Master Plan, Fort Lauderdale, Florida - Marine Engineer. Project encompassed all <br /> architectural and marine structural engineering works.Effort was the first of its kind for a public seaport in <br /> • <br /> ifs comprehensiveness as well as technologies and operations and command functions established. <br /> • <br /> • Miami Beach Seawall, Miami Beach, Florida - Project Manager. Responsible for the design of the <br /> • replacement of a deteriorating concrete seawall.The current seawall was in severe disrepair and <br /> required total replacement. Provided full marine civil engineering services for a new cantilever <br /> • steel sheet pile seawall in 30 ft. of water.The new seawall was designed to be located within the <br /> • existing seawall footprint. <br /> • Miami Circle Seawall Replacement,Miami,Florida-Project Manager.Responsible for the design of <br /> • the replacement of a deteriorating concrete seawall. The current seawall was in severe disrepair <br /> • and required total replacement.Provided full marine civil engineering services for a new cantilever <br /> • steel sheet pile seawall in 15 ft.of water.The new seawall was designed to be located within the <br /> • existing seawall footprint. <br /> • Harbourside Marina&Seawall,Jupiter-Florida-Marine Engineer.Marina and waterfront development. <br /> • The marina design integrates with the masterplan concept of an urban destination for both residential <br /> • entertainment activities. Since the marina is situated in a very sensitive ecological environment, <br /> extensive efforts were made to minimize impacts to the environment while simultaneously focusing <br /> • on functionality. Substantial reductions in the scope of the marina were made in order to comply <br /> • with the requests of the regulatory agencies. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Cba > www.bermelloajamil.com <br /> • 54 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.