<br /> _ Aurelio Matos, P.E.
<br /> • Director of Construction Services/Senior Project Engineer
<br /> •
<br /> • landscaping, pavement markings. signing, including overhead sign structures, and milling and
<br /> resurfacing. Duration: 12/2002-07/2003.Cost:$3M.Contact:FOOT Contact Person-Ali Al-Said,PE.
<br /> • District Six Permits Engineer.305.470.5100
<br /> •
<br /> • Widening and Reconstruction of SR 860 (Miami Gardens Drive), from NW 57th Avenue to NW 28th
<br /> • Avenue,Miami-Dade County,Florida(FDOT Category:10.1.10.3)-Senior Project Engineer.These were
<br /> two different construction contracts with two different prime contractors and several subcontractors.
<br /> • New drainage (french drain and close system) system under sandy conditions, construction of an
<br /> • additional lane in each direction,new curb and gutter,sidewalk,lighting,signalization,landscaping,
<br /> • pavement markings, signing, including overhead sign structures, and milling and resurfacing.
<br /> Duration: 6/2001 - 12/2002.Cost:$12M.Contact:FDOT Contact Person-Saud Khan,District Six MOT
<br /> • Engineer.305.470.5100
<br /> •
<br /> • Widening and Reconstruction of SR 826 (Palmetto Expressway)/NW 58th Sheet,from NW 47th Street
<br /> • to NW 62nd Street, Miami-Dade County, Florida (FDOT Category: 10.1, 10.3, 10.5.1)-Senior Project
<br /> Engineer. The Palmetto Expressway was widened in each direction in order to accommodate
<br /> • a High Occupancy Vehicle (HOV) lane. The job required channel excavation, muck removal.
<br /> • realignment of the NW 58th Street Canal in order to construct the new southbound off-ramp, new
<br /> • drainage system (french drain, close system, and trench drain along each side of the Palmetto),
<br /> widening of the existing NW 58th Street bridge over the Palmetto,complete ramps(4)reconstruction,
<br /> •
<br /> concrete barrier walls,MSE walls,lighting,signalization,landscaping,superpave asphalt pavement,
<br /> • pavement markings and signing.including several overhead sign structures. The canal realignment
<br /> • was accomplished by installing triple 72"diameter RCP pipes under the Palmetto Expressway by the
<br /> • microtunneling method and dual 108"diameter corrugated metal pipes under the new northbound
<br /> on-ramp and southbound off-ramp. The microtunneling operation of these size pipes was the first
<br /> • time that it was accomplished in South Florida.Also. Reclaimed Asphalt Pavement (RAP)wos used
<br /> • for embankment material on the ramps and for subgrade material with the mixture of 30%sand in
<br /> • order to achieve the required LBR of 40 or greater. This is the first time that RAP has been used for
<br /> embankment material in South Florida. Subsequent to this use. Miami-Dade County Public Works
<br /> • Department's Chief of Construction Management, Octavio Marin, P.E., contacted Aurelio Matos
<br /> • to get all respective information for its use. RAP material was used by Miami-Dade County for
<br /> • embankment material on the reconstruction of NW 87th Ave.over 1-75. Duration: 12/1999- 11/2001.
<br /> Cost: $15M. Contact: FOOT Contact Person- Dari Vorce, District Six Construction Project Manager,
<br /> •
<br /> 305 499.2392
<br /> •
<br /> • Roadway Widening and Reconstruction Projects, Palm Beach County, Florida(FDOT Category: 10.1.
<br /> • 10.3) - Project Engineer for severol projects under this contract including: SR 805, from SR 5 to 6th
<br /> Avenue South; from 6th Avenue South to 10th Avenue North; and 10th Avenue North to Arlington
<br /> • Drive. These three projects were under construction simultaneously under different innovative
<br /> • contracting methods and by two different contractors. Duration: 4/1999 - 11/1999. Cost: $1OM.
<br /> • Contact: FDOT Contact Person-Al Ewing. District Four Construction Project Manager,561.432.4966
<br /> • (RETIRED)
<br /> • Widening and Reconstruction of S.W. 137th Avenue(Tallahassee Road)(Speedway Blvd.),from the
<br /> • Homestead Extension of the Florida's Turnpike (HEFT)to SW 336th Sheet (Homestead-Miami Motor
<br /> • Speedway), North&South Projects.Miami-Dade County,Florida(FDOT Category:10.1,10.3, 10.5.1)-
<br /> Senior Project Engineer. These two projects were under construction simultaneously with two different
<br /> • prime contractors. Widening and reconstruction from two lanes to four lanes with a raised median
<br /> • and turning lanes,drainage system utilizing drainage structures along the curb line that discharged to
<br /> • a slab covered trench in the median area.new curb and gutter.lighting.signalization,landscaping,
<br /> • pavement markings and signing. Constructed o new two-span AASHTO concrete beam bridge over
<br /> the C-103 Canal. Completed the final estimates for these two projects with no procedural errors and
<br /> • commended by the FDOT District Six office. Duration: 12/1997-3/1999. Cost: $8M.Contact: FDOT
<br /> • Contact Person-Dari Vorce.District Six Construction Project Manager.305.499.2392
<br /> • Cba > www.bermelloajamil.cam