Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> O <br /> O <br /> •O _ Aurelio Matos, P.E. <br /> • Director of Construction Services/Senior Project Engineer <br /> • <br /> • construction of a new three-span flat slab bridge spanning the SFWMD C-11 Canal. Foundation <br /> • was on 18"x18"concrete piles with EDC's. Duration:07/2008- 12/2009. Cost:$17M. Contact:CAC <br /> Contact Person-Ignacio Halley,PE,President,305.829.0700 <br /> • <br /> • Florida's Turnpike Enterprise, Design/Build for the SUNPASS Lanes Conversion to Open Road Tolling <br /> • (ORT) on Florida's Turnpike at the Bird Road and Homestead Toll Plazas, Miami, Florida (FDOT <br /> Category: 10.1, 10.3)- Senior Project Manager/DC Manager. These two projects were design and <br /> • <br /> constructed within 6 months. Conversion of the existing Toll Plazas SUNPASS lanes to High Speed <br /> • Open Road Tolling SUNPASS lanes.Duration:08/2007-02/2008. Cost:$13M. Contact:CAC Contact <br /> • Person-Ignacio Halley,PE,President,305.829.0700 <br /> • THE DEMOYA GROUP,MIAMI,FLORIDA <br /> • FDOT District 4,Andrews Avenue Extension,from Atlantic Blvd.to North of Hammondville Rd.,Pompano <br /> • Beach, Florida (FDOT Category: 10.1. 10.3. 10.5.2) - Project Manager/ OC Manager. Construction <br /> • of an extension of Andrews Avenue through virgin land. Work included drainage.earthwork,base, <br /> curb& gutter,sidewalk, asphalt pavement,lighting,signalization,guardrail,and a three-span steel <br /> • <br /> girder bridge with MSE walls over Hammondville Road and CSXT railroad tracks. Foundation was on <br /> • 18"x18" concrete piles. Duration: 06/2006 -07/2007. Cost: $29M. Contact: DMG Contact Person <br /> • -A.J.de Moya.President,305.498.2923 <br /> • A&P CONSTRUCTION TRANSPORTATION ENGINEERS,MIAMI, FLORIDA <br /> • Miami Intermodal Center's(MIC)Consolidated Rental Car Facility(RCF),Miami International Airport <br /> • (MIA),Miami,Florida(FDOT Category: 10.1, 10.3, 10.4)-Senior Project Manager for the construction <br /> • of this mega-project. Responsible for overseeing the construction engineering operations, <br /> administration, management. and quality control of the Miami Intermodol Center's (MIC) <br /> • Consolidated Rental Car Facility(RCF)structure foundations,Access Roadways and Bridges to/from <br /> • the RCF facility,MIA Mover Light Rail System (from MIA to the RCF) foundations,and Onsite&Offsite <br /> • Utilities. Supervised a staff of six people consisting of field inspection and administrative personnel, <br /> • plans and specifications interpretation, making field changes during construction due to changes <br /> in field conditions, evaluating value engineering change proposals. negotiating additional work <br /> • cost proposals,responding to request for information,tracking potential claims,approving materials <br /> • (soils, structural and reinforcing steel,concrete, and asphalt) being incorporated into the projects. <br /> ® and other contract administration duties. Duration:07/2003-04/2006. Cost:$300M.Contact:APCTE <br /> -Antonio G.Acosta. PE,President.305.219 4718 <br /> • <br /> • CONSUL-TECH ENGINEERING,MIAMI, FLORIDA <br /> • Widening of SR 826 Northbound and 1-75 Northbound Concrete Ramp,Miami,Florida(FDOT Category: <br /> 10.1, 10.3, 10.5.3)-Senior Project Engineer for this project which accommodates two lanes of traffic <br /> • <br /> with shoulders from the existing single lane. This is the first time in the mainland USA that a concrete <br /> • segmental bridge has been widened,according to the American Segmental Bridge Institute (ASBI). <br /> • The structure was post-tensioned prior to performing the widening work in order to stabilize the <br /> • structure. Temporary steel towers were erected at each existing pier in order to stabilize the structure <br /> during the widening work. Duration: 12/2002-7/2003. Cost:$6M.Contact:FDOT Contact Person-Ali <br /> • Al-Said,PE.District Six Permits Engineer,305.470.5100 <br /> • <br /> • SR 932 (NW 103rd Street / West 49th Skeet) from SR 25 (Okeechobee Road) to West 2nd Avenue, <br /> Hialeah, Florida(FDOT Category: 10.1, 10.3)-Senior Project Engineer for the signalization,pedestrian <br /> • <br /> ramp improvements and milling and resurfacing for 3 miles in the heart of the City of Hialeah. <br /> • Duration: 12/2002-07/2003. Cost: $3M. Contact: FDOT Contact Person -Ali Al-Said, PE, District Six <br /> • Permits Engineer,305.470.5100 <br /> • Reconstruction, Milling and Resurfacing of NW 27th Avenue, from Ali Baba Avenue to NW 135th <br /> • Street,Opa-Locka, Florida(FDOT Category: 10.1, 10.3)-Senior Project Engineer. Project included a <br /> • new drainage system,roadway reconstruction,new curb and gutter,sidewalk,lighting.signalization, <br /> • Cba > www.bermellocjamil.com <br /> • 58 <br /> • <br />