Laserfiche WebLink
• <br /> O <br /> 0 <br /> O <br /> 0 <br /> O <br /> 0 <br /> Aurelio Matos, P.E. <br /> • Director of Construction Services/Senior Project Engineer <br /> 0 <br /> • . Professional Experience <br /> • Mr. Aurelio Matos, P.E.. has over 25 years of experience in the Transportation Engineering field, <br /> / specializing in project management, construction engineering, inspection and management <br /> • .e.. 0 (CEI&M),as well as minor transportation engineering design. Mr.Matos has worked on several multi- <br /> • j{!l e L million dollar roadway, bridge.and utility projects,completing close-out packages for construction <br /> • V <br /> igty.+-� projects since 1985. He is a recipient of the 1999 FDOT/FTBA Rural Construction Award for his work <br /> "'•�` -, / on the SW 137th Avenue (Tallahassee Road/Speedway Blvd) construction project and recipient of <br /> • s `11 the 2002 FDOT/FTBA Major Interchange Award for his work on the SR 826/NW 58th Street Interchange <br /> • y_ ` ".�`/, , , project,both in Miami-Dade County. <br /> • OIS1.��S. <br /> • PROJECT EXPERIENCE <br /> BERMELLO AJAMIL S. PARTNERS,INC.,MIAMI,FLORIDA <br /> • Director of Construction Services/Senior Project Engineer. Director of Construction Services directly <br /> • responsible for running the daily operations of the Construction Engineering&Inspection(CEI)Services <br /> • EDUCATION Division of the firm. In addition. Senior Project Engineer responsible for overseeing the construction <br /> • Bachelor of Science in Civil engineering operations, administration, management, and quality control of construction projects <br /> Engineering.New Jersey in South Florida. <br /> • Institute of Technology, 1987 <br /> • Currently responsible for the CEI Oversight services on the MDX 87409 Design-Build project, SR 874 <br /> Post-Graduate Studies in Mainline Widening from Kendall Drive to the Palmetto Expressway (SR 826). with the Design-Build <br /> • Construction Engineering & team of Community Asphalt Corp. /C3TS Engineers. (FDOT Category: 10.1, 10.3, 10.4). Duration: <br /> • Management, New Jersey 09/2010-Present. Cost: $46M. Contact:MDX Contact Person-Juan Toledo,PE,Assistant Director <br /> Institute of Technology. 1989 <br /> • of Engineering and Construction.305.637.3277 <br /> • REGISTRATIONS COMMUNITY ASPHALT CORP.,MIAMI, FLORIDA <br /> • Professional Engineer,Florida, Miami-Dade Expressway Authority (MDX) Design/Build for the Central Boulevard Realignment, <br /> • P.E.No.71701 Widening, and Service Ramps at the entrance to the Miami International Airport (MIA) Terminals. <br /> • Professional Engineer,New Miami,Florida(FDOT Category: 10.1,10.3, 10.4)-Senior Project Manager/QC Manager. This project <br /> • Jersey,P.E.No.24GE043298 consists of the construction of three (3) new AASHTO concrete beam bridges and widening of <br /> three (3) existing bridges along Central Boulevard. Complete reconstruction of Central Boulevard <br /> • Professional Engineer.Texas. (main artery into and out of MIA), NW 20th Street, McLaughlin Drive. and the North Service Road. <br /> • P.E.No.96291 Construction of NW 42nd Court,from NW 18th Street to McLaughlin Drive,including a new single-span <br /> steel girder bridge over the SFWMD C-4 Canal. Duration:05/2010-09/2010. Cost: $42M. Contact: <br /> • Professional Engineer,Georgia. CAC Contact Person-Ignacio Halley, PE, President,305.829.0700 <br /> • P.E.No. PE031003 <br /> • Professional Engineer. FDOT District 6,Design/Build PPP Project for the Reconstruction of SR-5(US-1),from MP 3.560(SFWMD <br /> • Alabama,P.E.No.31391-E C-111 Canal)to SW 344th Street(Palm Drive)(9 miles),Florida City,Florida(FDOT Category:10.1,10.3, <br /> 10.5.1) -Senior Project Manager/ OC Manager. Reconstruction of 9 miles of US-1, which includes <br /> • Professional Engineer,New clearing and grubbing, demucking. embankment, drainage, limerock/asphalt base, asphalt <br /> York,P.E.No.088734-1 <br /> • pavement, median concrete barrier wall, lighting, signalization, AT&T ducfbank, and a three-span <br /> • AASHTO concrete beam bridge over the SFWMD C-111 Canal and two (2) single span flat slab <br /> • AFFILIATIONS animal crossing bridges with MSE walls. Duration: 03/2008-09/2010. Cost: $110M. Contact:CAC <br /> American Concrete Institute Contact Person-Ignacio Halley,PE, President.305.829.0700 <br /> • (ACI),Member ri 124625 <br /> • FDOT District 4, SR 823 (Red Road). from Miami-Dade/Broward County Line to south of Pembroke <br /> American Soc(ASCE), <br /> of Civil Rood(3 miles).Miramar,Florida(FDOT Category:10.1,10.3 Senior Project Manager/QC Manager. <br /> • Engineers(ASCE),Member= ) gig ) 1 g g <br /> • 206590 This project consisted of drainage, lighting, signalization, sidewalk, and milling and resurfacing of <br /> existing pavement. Duration:02/2009- 12/2009. Cost:$5M. Contact:CAC Contact Person-Ignacio <br /> • Construction Management Halley,PE,President,305.829.0700 <br /> • Association of America <br /> • (CMAA),Member=08240 FDOT District 4,Griffin Rd(SR 818)Reconstruction and New Bridge Over the C-11 Canal,from Volunteer <br /> Florida Engineering Society Rd to Flamingo Rd (3 miles), Southwest Ranches, Florida (FDOT Category: 10.1. 10.3, 10.4) - Senior <br /> • Project Manager/OC Manager. Complete roadway reconstruction including drainage,earthwork, <br /> (FES).Member # 9001220 <br /> • base. curb & gutter, sidewalk,asphalt pavement, decorative lighting, signalization, guardrail, and <br /> • Cba > www.bermelloajamil.com <br /> • 57 <br /> • <br />