<br /> • did not exist. The plan provided for economic projections, development of large user agreements
<br /> and other means for the County to economically start up the water utility.The plan resulted in the
<br /> •
<br /> identification and eventual development of a new well field strategically located to stay away from
<br /> • potential development areas, sufficiently away from coastal areas to prevent salt water intrusion,
<br /> • and in a buffer area next to the Big Cypress National Preserve so as to minimize impact on this
<br /> • national park.
<br /> • Comprehensive Water Plan,Lee County,Florida - Project Manager and Project Engineer for the Lee
<br /> • County Comprehensive Water Plan.Initially this plan called for the assessment of the existing water
<br /> • system the County owned,and to provide for immediate improvements that focused on leakage
<br /> • control, illegal taps and water grid strengthening through strategic new water mains in order to
<br /> bring the system up to standards where further expansion was possible.The initial plan also focused
<br /> • on the water treatment system which had been designed for traditional South Florida ground water
<br /> • treatment, yet the existing plant was the only surface water treatment plant in South Florida with
<br /> ® water being provided through an intake in the Caloosahatchee River. Subsequent to completing
<br /> of the first phase, the plan looked forward to the development of new water resources,treatment
<br /> • facilities, storage and distribution for an area expected to grow well over 400,000 population. The
<br /> • plan resulted in a major capital expansion program including development of a new well field and
<br /> • treatment facility in southern Lee County. and major storage facilities and repumping stations to
<br /> strengthen fire supply capability throughout the County.
<br /> • 36 MGD Waste Water Treatment Plant, Hollywood, Florida - Project Engineer on the design of a
<br /> • sludge treatment facility for the City of Hollywood's 36 MGD waste water treatment plant.This design
<br /> • included the first ever use of centrifuge to pre-thicken sludge before a heat treatment process.The
<br /> final sludge de-watering was achieved through centrifuges.
<br /> •
<br /> • Water Treatment Plant, Fort Myers, Florida-Project Manager and Project Engineer for the expansion
<br /> • of the City of Ft.Myers Water Treatment Plant by six(6) million gallons per day.The design included
<br /> aeration, lime softening, filtration and disinfection through chlorination.The design also included a
<br /> •
<br /> roil off-loading lime facility.
<br /> •
<br /> • DEVELOPMENT
<br /> The World, Dubai,UAE
<br /> •
<br /> Grand Central Master Plan,Dubai,UAE
<br /> • Dubai Maritime City,Master Plan and DCR, Dubai, UAE
<br /> • Fujairah Maritime City, Fujairah.UAE
<br /> • Palancar Reef Resort Master Plan,Cozumel,Mexico
<br /> Turnberry Isle Yacht Club,Aventura, Florida
<br /> • Aventura Mall,Aventura, Florida
<br /> • Lummus Park,Miami Beach, Florida
<br /> • South Beach Park,Miami Beach, Florida
<br /> • Margaret Pace Park,Miami, Florida
<br /> • MARINA F. WATERFRONT PLANNING
<br /> • Harry S.Truman Presidential Park, Key West, Florida
<br /> • South Pointe Marina,Miami Beach, Florida
<br /> Turnberry Isle Marina, North Miami Beach,Florida
<br /> • Ensenada Mega yacht Center, Ensenada Mexico
<br /> • Club Costa Baja Marina Master Plan, La Paz, Baja California,Mexico
<br /> • Pardenbaai Yacht Basin,Oranjestad,Aruba
<br /> Grove Isle Marina,Coconut Grove, Florida
<br /> •
<br /> Puerto Plata,Dominican Republic
<br /> • Sailfish Point Marina,Hutchinson Island, Florida
<br /> •
<br /> ® Cba D www.bermelloajamil.com
<br /> 33
<br /> •
<br />
|