My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SATYEN M. THAKAR, Ed <br /> I O . Associate Engineer I <br /> Project Assignment: Remediation <br /> I Operations Manager; Remediation Systems, Petroleum Products Corpo- <br /> ration—Day-to-day management of remediation system including operation. <br /> maintenance and optimization of the largest Superfund site in South Florida. <br /> I Prepare monthly and quarterly progress reports for clients and regulatory <br /> agencies. Conduct life cycle assessment that included estimating the opera- <br /> tional time and total cost associated with system operation. Conduct evalua- <br /> tion studies of alternative remedial technologies that could be used in conjunc- <br /> t] Education tion with the existing slurper system. <br /> M.S.. Environmental <br /> Engineering—Florida Plant Manager/Laboratory Manager; Pharmaceutical Effluent Water <br /> aInternational University. 2004 Treatment, Watson Laboratories—Performed jar tests and recommended <br /> B.S..Chemical Engineering— new chemicals to the client for effluent treatment, monitored the chemical <br /> University of Mumbai. India. process and made appropriate system adjustments for efficient recovery of <br /> 2000 floc. <br /> IField Manager; Bamboo Trailer Park, FDEP Preapproval Program— <br /> Oversee excavation of contaminated soil at site in Broward County. Prepare <br /> I Registrations associated permits. locate subsurface utilities, conduct breathing zone air <br /> Engineer-in—Training. Michigan monitoring, and prepare report. <br /> OSHA 40-hour HAZWOPER <br /> training and 8-hour refresher Project Manager; Multiple Gas Stations,Numerous Clients—Perform site <br /> I assessments. inspect soil/groundwater contamination, install temporary moni- <br /> toring wells. oversee installation of permanents wells. and design remedial <br /> systems(air sparge/soil vapor extraction)at numerous sites in South Florida. <br /> Areas of Specialization <br /> I Soil and Groundwater Project Manager; Multiple Clients—Oversee the drilling and installation of <br /> Contamination Assessments: groundwater monitoring wells to evaluate onsite contaminant plumes. Responsi- <br /> Operation. and Maintenance of bilities include real-time measurement with the use of an organic vapor analyzer <br /> 1 Remediation Systems: Phase UII equipped with a flame ionization detector(OVA/FID), split spoon sampling. re- <br /> Environmental Site Assessments cording lithology.and groundwater sampling. <br /> Task Manager; Impact to Construction Assessment, Florida Department <br /> I of Transportation (FDOT)—Performed site assessment for FDOT with the <br /> objective of preventing construction workers' exposure to any potential con- <br /> taminants. Provided oversight of drilling activities: completed soil boring <br /> I logs: and wrote reports to document the extent of work done. providing rec- <br /> ommendations. <br /> Field Manager; Central Florida Commuter Rail Transit Project— <br /> I Performed due diligence investigative sampling of 62 miles of CSX active <br /> railroad corridor for property acquisition by FDOT. Provided oversight of <br /> sampling team to ensure CSX safety policy was not violated. Used global po- <br /> sitioning system to record sampling locations. Coordinated lab activities for <br /> over 2.000 soil samples. <br /> Field Team Member; Stauffer Plant—Team member that designed water <br /> treatment system. assisted in setup. collected samples to check carbon break - <br /> through. inspected periodically leachate collection system. <br /> 1 Consultant; SFWMD—Reviewed historical data and analyzed topographic <br /> data and design drawings of flow structures. Stream gauged District channels <br /> using different acoustic Doppler equipments to collect flow information. Per- <br /> formed quality assurance/quality control (QA/QC) of the collected data: up- <br /> 1 loaded the reviewed data into District database. <br /> 1 EC <br /> s Carmfhg&ben" y.Mc. PAPAW.yAxGcrn'oF Suer ISIFSIAPPFSDICtS\RFSUMiS SUNYISIS.DOC-043012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.