Laserfiche WebLink
PROBAS ADAK, E.l. <br /> 1 ;4",t1.M} _: .r - Page 2 <br /> Task Manager; Sam's Recycling and Junk Cars Inc.—Responsible for <br /> preparation and implementation of post remediation monitoring, sampling. <br /> well abandonment, and preparation of technical reports associated with the <br /> remedial and monitoring activities at the site in Pompano Beach. Florida. <br /> ' Engineering Support; Air Permitting, SFWMD—Assist the Engineer of <br /> Record in developing Title V permits associated with SFWMD pump stations <br /> at sites in Broward and Palm Beach County. Florida. Tasks included preparing <br /> emission calculations; FDEP application forms, and CAD drawings. <br /> Project Engineer; Artesian Well Abandonment, SFWMD—Provided field <br /> oversight, contractor management. technical support. and report preparation to <br /> properly abandon several Floridan wells within the C-23/24 project area locat- <br /> ed west of Fort Pierce on SR 70 in St. Lucie County. Florida. <br /> Field Engineer; Multiple Projects, SFWMD—Conducted field sampling as- <br /> sociated with Phase II ESAs for multiple projects spread across the District <br /> boundaries. <br /> Task Manager; Indoor Air Quality Studies, City of Pembroke Pines and <br /> Noven Pharmaceuticals—Conducted site visit for collecting air samples.ana- <br /> lyzing sample results. Prepared technical report documenting the results and <br /> provided the client with recommendations. <br /> Project Manager/Engineer; Spill Prevention,Control,and Countermeasure <br /> Plan.Anda Inc.—Compiled data and prepared plan/report for a facility located <br /> 1 in Broward County. Florida. Plan was prepared in accordance with applicable <br /> procedures and used as a best management practices document. <br /> Project Manager/Engineer; Stormwater Permitting,Jet Aviation—Provided <br /> the client with technical assistance required to permit an industrial process dis- <br /> charge into Miami-Dade stormwater system. <br /> Project Engineer/Cask Manager; Contamination Assessment, Reb Oil <br /> Inc.—Collected soil and groundwater samples to delineate extent of hydrocar- <br /> bon contamination and petroleum impacts. Performed field assessment and re- <br /> potted data for several sites located in Orange and Brevard County.Florida. <br /> Project Engineer; Regional Risk Assessment of Selenium in the East <br /> Coast Buffer Project Area, SFWMD—Managed field sampling efforts con- <br /> ducted by a team of five geologists and engineers in an area spread across two <br /> counties and a total of approximately 3.000 acres to be acquired for restoration <br /> projects. <br /> 1 Task Manager/Engineer; C-11 and C-9 Projects, SFWMD—Assist in de- <br /> veloping plans required for obtaining closures associated with storage tank fa- <br /> cilities in the project footprint area in Broward and Miami Dade Counties. <br /> 1 Florida. Prepare reports and conduct field sampling activities. Generate CAD <br /> drawings and GIS applications for use in SFWMD projects. <br /> 1 <br /> 1 <br /> 1 £c7 <br /> GIYINI111Cm1 & •ht PAPAUI.Y&NGYCIIY OF SUNNY ISLESNAPPI:NDICENtFSU\IFS SUNYISIS.IXIC-01301' <br />