My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> O PROBAS ADAK, E.1. <br /> I ilk Senior Associate Engineer 11 <br /> Project Assignment: Remediation <br /> I Design Engineer; Bulk Storage Facilities, PetroLiance LLC—Prepared de- <br /> sign drawings for bulk fuel/industrial oil storage facilities in Miami-Dade and <br /> Orange Counties for a major fuel and lubricants distributor. Design features <br /> included tanks specifications. piping, containment. pumping and structural as- <br /> I pects of the new plant. Duties also included permitting the bulk storage facility <br /> with the Counties. <br /> I Education Project Engineer; Contamination Assessment, McMillan Oil Company— <br /> M.S..Civil Engineering— Prepared proposal and collected groundwater samples to delineate extent of hy- <br /> University of Texas. 2002 drocarbon contamination and petroleum impacts. Performed field assessment <br /> I B.S..Civil Engineering— and reported data for the site located in Miami Dade County. Florida. <br /> Jawaharlal Nehru Technological <br /> Institute. India. 1998 Design Engineer; Cliff Berry Inc.—Developed the design of stack required <br /> for proper dispersion of exhaust from the waste treatment facility in Miami. <br /> IFlorida. Design drawings also included wind load calculations for the stack. <br /> Registrations Engineer II; Contamination Assessment; 7-Eleven Inc.—Performed soil. <br /> ' Engineering Intern.Michigan groundwater. and air sampling at numerous facilities throughout Florida. Col- <br /> OSHA 40-hour HAZWOPER lected field measurements generally associated with soil and groundwater in- <br /> training vestigations for the preparation of investigative work plans. contamination as- <br /> sessments. and remedial design documents. Provided interpretation and sum- <br /> I mation of field data, and prepared technical documents related to soil and <br /> groundwater assessment and remedial actions of associated areas impacted by <br /> Areas of Specialization petroleum and hazardous waste contamination. <br /> Soil and Groundwater Contamina- <br /> tion Assessments:Construc- <br /> tion/Installation. Field Engineer; C-44 Copper Remediation, SFWMD—Acted as a field en- <br /> Operation, and gineer to support the District for the following during construction: (I) con- <br /> Maintenance of Remediation Sys- struction observation in support of construction management services: (2)con- <br /> ' terns: Phase I/II Environmental <br /> Site Assessments: Data Analysis struction observation in support of environmental reporting: (3)quality control <br /> surveying at five milestones during project construction: (4) materials testing <br /> and Interpretation:Air Quality during project construction: and (5) construction project management support <br /> Studies including preparation of record documents for submittal to the FDEP. U.S. <br /> 1 Fish and Wildlife Service, and USACE. <br /> Task Manager/Design Engineer; Remediation Activities at Merchants #9, <br /> I FDEP Preapproval Program—Assisted in developing a RAP, and provided <br /> engineering design calculations and construction drawings for a proposed mul- <br /> ti-phase remediation system in St. Lucie County. Florida. for the removal of <br /> hydrocarbon contaminants. Prepared bid documents and facilitated the bidding <br /> I process. Responsible for construction oversight. day-to-day operation and <br /> maintenance (O&M)of the remedial system. and sampling. Prepared technical <br /> O&M reports associated with the remedial system activities. <br /> I Task Manager/Technical Support; Petroleum Contamination Services at <br /> Phillips 66 Facility, FDEP Preapproval Program—Responsible for con- <br /> struction oversight. sampling, day-to-day O&M of the remedial system in <br /> I Pompano Beach. Florida. Prepared technical O&M reports associated with the <br /> remedial system activities. <br /> Task Manager/Technical Support; Tank Removal at Merchants#7, FDEP <br /> I Preapproval Program—Responsible for storage tank removal and closure as- <br /> sessment followed by remediation in terms of source removal and insitu air <br /> sparging. preparation and implementation of post remediation monitoring. and <br /> I sampling. Prepared technical reports associated with the remedial and monitor- <br /> ing activities in St. Lucie County. Florida. <br /> so <br /> & <br /> Constithig 3 Technology.toe PiPAUI.YANGWI3Y OF SUNNY IS US\.V PENDICFSRFSUMFS SUNIISIS.DOC-0l3012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.