F.J.I <br /> "PACO" AMRAM, P.E., LEED AP <br /> E = �r Senior Engineer 11 <br /> Project Assignment: Energy <br /> I Project Manager; Fast-Tracked Environmental Permitting,Planning,and <br /> Support; Walbridge Aldinger Co.—A new Security Forces Facility was to <br /> be built at MacDill Air Force Base in Tampa. Florida. over petroleum and <br /> chlorinated solvent sites. The required environmental plans were expedited <br /> I and approved by the U.S. Army Corps of Engineers (USACE) on the first <br /> submittal. Agency negotiations. sampling. submittals. and approvals of <br /> National Pollutant Discharge Elimination System (NPDES) permits were fast- <br /> I Education tracked to allow the needed dewatering and treatment. This expedited the <br /> B.S.. Civil Engineering— permitting by over 4 months. Directed the actual dewatering and treatment <br /> Princeton University. 1986 services. health and safety monitoring, subsurface utiltity evaluations. water <br /> line permitting, USACE submittals. reporting and invoicing. Contracted <br /> Iservices were completed at more than 30 percent below the original budget. <br /> Registrations Project Manager/Engineer; Environmental Support for Municipal <br /> I <br /> Professional Engineer, Florida. <br /> No.45133 Roadway and Drainage Reconstruction Project, Clearwater Gas <br /> Company—A municipal roadway and drainage reconstruction project <br /> Leadership in Energy and Envi- encountered impacts from an adjacent former manufactured gas plant (MGP) <br /> Ironmental Design Accredited facility in Clearwater. Florida. To prevent costly delays to this major roadway <br /> Professional(LEED AP) project. a response plan was developed with City and road contractor <br /> OSHA 40-hour HAZWOPER and personnel, and fast-tracked roadway sampling events. evaluation of short-term <br /> annual 8-hour refresher training worker-exposure criteria. health and safety plan preparation. and permitting <br /> I Emergency Medical Technician/ <br /> Ambulance training for the needed dewatering, treatment and discharge. By evaluating and <br /> presenting overlapping site data, state agency approval was obtained to use <br /> multiple generic NPDES permits. which expedited permitting by almost 4 <br /> months. Designed. directed installation of. maintained. and monitored the de- <br /> I watering treatment system. Directed oversight of the trenching for detection <br /> Areas Of Specialization and proper disposal of coal-tar-impacted soils. Coordinated with municipal <br /> Aquifer Remediation Design and and roadway contract personnel. and facilitated quick cost-saving solutions <br /> I Evaluation.Chemical Oxidation <br /> Applications. Bioremediation that addressed the environmental conditions encountered while minimizing de- <br /> lay's or impacts to the construction work. The roadway support project phases <br /> Systems. Fuel System Design and spanned approximately I year. <br /> Inspection. Environmental Support <br /> I for Heavy Construction Projects. Project Manager/Engineer; Recycling Facility Permit Renewal; Ft. <br /> C&D Debris Recycling Facility Myers, Lee County, Florida; USA Recycling Holdings, LLC—Reviewed <br /> Plans and Permitting. Project the previous permit. inspected the upgraded facility, and prepared an <br /> I Management. Fast-Tracked <br /> Permitting. and Negotiations application for renewal of the FDEP waste processing facility permit. Prepared <br /> the updated engineering report, O&M manual. and a facility layout plan that <br /> reflected the extensive modifications of the C&D debris recycling facility in <br /> Fort Myers. Florida. Met with the new owner and revised the application to <br /> I represent (and thus gain permission for) the operations as the new owner <br /> intends to run them. Obtained approval of stormwater management system <br /> construction certification, and responded to each agency request for additional <br /> Iinformation. Approval is pending a final response submittal. <br /> Project Manager/Engineer; Fast-Tracked Remediation Construction in <br /> Pharmaceutical Clean Room, Confidential Client—A system of multi- <br /> I phase extraction (MPX) wells. trenching. piping. resurfacing, epoxy surface <br /> coating. and roof penetrations for piping. followed by construction cleanup. <br /> had to be completed during the client's I-week partial shutdown in December. <br /> I Modified the client's RAP design to improve constructibility. reliability, and <br /> reduce long-term impacts to clean room operations. Upgraded components to <br /> meet FDA regulations restricting materials contacting the air in the drug <br /> production clean room. Prepared precise manhole, well location. and manhole <br /> I piping drawings to eliminate "trial and error" concrete cutting and piping <br /> work. Successfully coordinated,directed and quality-inspected all construction <br /> 1Ecr <br /> ""gtl't <br /> Consulting&Todoso/ogy.Inc. MAUI.VANGM Y OF SUNNY tStXS\A rFvtncE5\A MRAMDoc-03301- <br />