Laserfiche WebLink
MARC A. LEFEBVRE, P.E. <br /> I O 4. <br /> Principal Engineer <br /> Project Assignment: Project Manager <br /> 1 Project Manager/Project Engineer; Remedial System Design and Opera- <br /> tion, Florida Department of Environmental Protection(FDEP) Preapproval <br /> Program—Responsible for assessing. designing. implementing. and operation <br /> and maintenance of remedial action for Banks Amoco facility in Miami-Dade <br /> County. <br /> Project \tanager; Aerojet Canal Dredging/Remediation Project, <br /> I Education SFWMD—The Aerojet Canal is located adjacent to and on the west side of <br /> B.S..Chemical Engineering— Southwest 232nd Avenue. Florida City. Miami-Dade County. Florida. The for- <br /> State University of New York at mer Blue Heron Aqua Farm (also referred to as the fish farm) is situated just <br /> I Buffalo. 1983 west of the Aerojet Canal. Contaminated sediments from the fish farm as deep <br /> as 10 feet were removed from a 150 foot wide by 1.200 foot length of the closed <br /> loop canal. Removal of sediments and reduction of phosphorus in the closed <br /> loop canal was critical to project success. Aluminum sulfate was applied to the <br /> 1 Registrations canal water to precipitate the phosphorus at the conclusion of dredging. Bathy- <br /> Professional Engineer. Florida. metric data confirmed dredging success and water quality monitoring indicated <br /> No. 0050615 dissolved and suspended phosphorus had been successfully treated. The project <br /> Professional Engineer. Georgia, received approval from the National Park Service: land bridges were removed: <br /> No. 035527 and the canal was turned over to USACE/SFWMD for inclusion in the spreader <br /> Professional Engineer. Michigan, canal project ahead of schedule. <br /> No. 6201057880 <br /> I Professional Engineer. North Design Engineer; Dry-Cleaning Solvent Supply Company—Designed sev- <br /> Cazolina. No. 037095 eral conceptual alternatives for a facility in Miami. Florida. Used air sparging <br /> Professional Engineer. Puerto to remediate perchlorethylene (PCE) plume and daughter products migrating <br /> Rico.No. 25006 offsite along utility corridor. <br /> I <br /> Project Engineer; Remediation Compliance Assessments and Wastewater <br /> Treatment Projects, Ryder System, Inc.—Developed numerous RAPs for <br /> I Affiliations <br /> American Institute of Chemical sites in Florida and designed a wastewater treatment system for a Ryder truck <br /> wash facility in Miami. Florida. Was also involved in developing 28 spill pre- <br /> Engineers vention. Control. and countermeasure plans throughout Florida. Georgia. and <br /> National Water Well Association Alabama for various Ryder Truck Rental facilities. <br /> I <br /> Project Engineer; Wastewater Design, Serbin Fashions—Arranged for the <br /> disposal of 100 drums of RCRA hazardous waste material at a facility in Mi- <br /> Areas of Specialization ami. Florida. Also performed an industrial audit of the facility and designed a <br /> Soil and Groundwater wastewater treatment system to address silver-laden wastewater. <br /> Remediation. Systems Design. <br /> Contamination Assessments. Project Engineer; Contamination Assessment and Remedial Action Plan <br /> I Industrial Wastewater Treatment. (RAP), Midway Airlines—Prepared an approved contamination assessment <br /> Construction Management. Project and RAP for this facility at the Miami International Airport. which was im- <br /> Management.Chemical pacted by chlorinated solvents. lead. and chromium. Also coordinated the <br /> IEngineering characterization and disposal of hazardous waste oil/waste separator sludge. <br /> Project Manager; Contamination Assessment and Feasibility Study, <br /> F.E.C. Railroad—Performed contamination assessment investigation and bio- <br /> I remediation feasibility study for large diesel fuel spill in a municipal wellfield <br /> in Miami. Florida. Implemented interim remedial measures to address free- <br /> product recovery. <br /> IProject Manager, US Sugar Corporation Acquisition, South Florida Wa- <br /> ter \lanagement District (SFW\ID)—Conducted Phase I and Phase II as- <br /> sessment work for both Bryant and Clewiston Sugar Mills as part of SFWMD <br /> I acquisition of US Sugar Corp assets. Managed the technical aspects of project <br /> and project budget. <br /> I ECT <br /> &mormarml CcnuIOv&lechnology Inc. PAPAUI.YANGICIrY OF SUNNY ISIYMPPENDICESRESUS/PS SUNYISIS.DOC-04301± <br />