Laserfiche WebLink
MARC A. LEFEBVRE, P.E. <br /> Oa Page 2 <br /> Project Manager, Copper Uptake in Apple Snails Study, SFWMD— <br /> Designed and constructed a 32-square-foot enclosure for the establishment of <br /> native vegetation and forage for pomacea paludosa (Florida apple snail). The <br /> purpose of the study was to measure copper uptake in snails grown on sedi- <br /> ments with elevated copper concentration to assess the potential for impacts to <br /> the Everglades snail kite. <br /> Project Manager, Picayune Strand Restoration Project (PSRP) Shooting <br /> Area Cleanup, SFWMD—Conducted lead removal from I2 spoil piles used <br /> for illegal target practice in the PSRP. Lead removal was required prior to con- <br /> struction of a pump station by the U.S. Army Corps of Engineers (USACE). <br /> Project coordination involved preparation of project plans and a final report <br /> for review and concurrence by the FDEP and U.S. Fish &Wildlife Service. <br /> Project Manager; SFWMD—Project manager on numerous projects for <br /> 1 SFIVMD. including Phase I/Phase II environmental site assessments (ESAs). <br /> soil remediation projects. and ecological risk assessments. Projects include: <br /> • Griffin Brothers—Phase VII Assessment. <br /> • Palm Beach Downs—Phase 1/11 Assessment. <br /> • McMurrain Farms—Phase I/11 Assessments. Risk Assessment. BMP. <br /> • Estates of Swan Lake—Phase 1/11 Assessment. <br /> • Pine Venture—Phase VII Assessment. Risk Assessment. <br /> • Bishop Nixon—Phase I/11/IV. Risk Assessment. Development of Cleanup <br /> Costs. Litigation Expert Testimony. <br /> • Swan Lake—Phase 1/11. Remediation. <br /> • Winthrop/Griffin—Phase I/II Risk Assessment. <br /> • Arco Property(Indian River Lagoon)Phase 1/II Risk Assessment. <br /> • D'Albora Property(Indian River Lagoon)—Phase I/I1 Risk Assessment. <br /> • Platts Property(Indian River Lagoon)—Phase VII Risk Assessment. <br /> • McArthur Property(Indian River Lagoon)—Phase 1/11 Risk Assessment. <br /> • Triple C Property(Indian River Lagoon)—Phase VII Risk Assessment. <br /> • Graves/Tetley(Indian River Lagoon)—Phase I/11 Risk Assessment. <br /> • Woemer Turf(EAA)—Phase I. II. III. Risk Assessment Remediation Pro- <br /> ject.BMP. <br /> • Copper Pilot Study(Indian River Lagoon)for soil inversion using a disk plow. <br /> • Lakeside Ranches—Phase 1/11/111 remediation cost estimate for a cattle dip vat. <br /> • Wilder Property—Phase 1/II. <br /> • Sexton Property(Indian River Lagoon)—Phase IRI. Risk Assessment. <br /> • Southern Golden Gates Estates(Picayune Strand)Phase III Pilot Study for <br /> remediation of chlordane impacted soils. <br /> • Conoley. A& G. Marcott (Indian River Lagoon)—Phase I, II. Risk Assess- <br /> ment. <br /> • Belle Meade(Picayune Strand)Phase III. <br /> • Riverview Development—Phase VII. <br /> • Agler Property—Phase III Expanded Copper Assessment. <br /> • Consolidated Citrus—BMP. <br /> • Equus Farms—Phase I. II. Risk Assessment. <br /> • Keri Tower Site—Phase VII. <br /> • Prudential Property—Phase VII. <br /> • Khaluchi Property—Phase VII. <br /> • Griffin Brothers—Phase VII. <br /> • Southern Golden Gate Estates (Picayune Strand)—Remediation of 28 acres <br /> of Chlordane-Impacted Soils. <br /> • Nubbin Slough Restoration. <br /> • C-I 1 Project Footprint Corrective Action on 14 properties. <br /> F'wfl.nwa Goradtrg&bit-clogs 1>< PAPAULYANGICITY OF SUNNY ISLFSIAPPESDICESIRE_SUMS SUhYI5IS.DOC-043012 <br />