My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRIS R. FAGERSTROM, P.E. <br /> 0 O Page 2 <br /> and regraded the existing roadway to provide stormwater treatment where <br /> none existed previously. <br /> Project Manager; Chassahowitzka River Basin Watershed Management <br /> Plan, SWFWMD—Conducting watershed modeling. LIDAR mapping and <br /> development of digital elevation model, watershed delineation, watershed in- <br /> ventory. digital flood insurance rate maps. GIS/ArcHydro, BMS. and GWIS <br /> database as part of the plan. <br /> Project Manager; Cambridge Basin Stormwater Quality, Quentin L. <br /> Hampton & Associates, Inc.—Conducted stormwater quality monitoring. <br /> QAPP preparation. and final monitoring report as part of a total maximum dai- <br /> ly load grant. Nine sample events were collected at the inflow and outflow of <br /> the system to access the system's pollutant removal efficiency. Pollutant loads <br /> were developed based on the flow data collected and a final monitoring report <br /> ' was prepared. <br /> Project \tanager; Tributary "E" Stormwater Park, Volusia County— <br /> Conducted design and construction administration service for a 15-acre <br /> stormwater park in southeast Volusia County. Florida. The offline treatment <br /> system will serve a 1.100-acre watershed. The site design includes grading and <br /> drainage plans. precast restroom building, asphalt parking, irrigation and pond <br /> aeration. 3.300+ feet of walking trail. Other tasks completed for this project <br /> include watershed modeling using S\VMM. wetland restoration. and storm- <br /> water pollution prevention plan preparation. <br /> Project Manager; Draa Field Stormwater Park, City of Titusville—The <br /> goal of this project was to design a stormwater management system that would <br /> help meet the pollutant reduction goals of Indian River total maximum daily <br /> load and alleviate flooding within the basin. These goals will be accomplished <br /> by creating a regional stormwater treatment system at Draa field. Draa field <br /> was the historic location of the City's high school football field. The regional <br /> treatment system shall consist of a 4-acre settling basin, followed by a wetland <br /> ' marsh. then outfalling to an existing ditch that will be improved by removing <br /> exotic vegetation. replanting with native wetland vegetation. providing a natu- <br /> ral meander. and creating wetland pools for additional habitat. Project high- <br /> lights include: conducting a small scale basin study. ICPR model development, <br /> rails-to-trails coordination. environmental resource permitting. and park amen- <br /> ities. <br /> Project Engineer; Depot Park Brownfield Restoration, City of Gaines- <br /> ville—Instrumental in the redevelopment of a 35-acre site located south of the <br /> city's downtown and within its designated Enterprise Zone. where significant <br /> soil and groundwater contamination had been identified as a result of a former <br /> manufactured gas plant operation and historic railway activity. Assisted in the <br /> preparation of a QAPP, and participated in community outreach meetings and <br /> public presentations to educate the surrounding community on this brownfield <br /> redevelopment project. Project tasks included site assessment, human health <br /> and ecological risk assessment, feasibility study. remedial action planning. <br /> permitting, reuse planning and design and construction oversight of a unique <br /> stormwater park capable of treating storm water runoff from the downtown ar- <br /> e ea. This project is widely thought to be one of the State's most successful <br /> brownfield projects. <br /> seamQ <br /> En actmentm Cmmufag a bd.Nogr,ac PAPAW,YAXG\CIT OF SUNNY ISLES\APPENDICESW SUMES SUNYtsts.DOC-043012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.