My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEVEN G. DANSKINE, P.E. <br /> I O Cr IP Staff Engineer II <br /> Project Assignment: Civil Engineering <br /> I Project Manager; Central Beach Flood Mitigation Phase II, City of New <br /> Smyrna Beach—Responsible for design of roadway. water. and sewer utili- <br /> ties replacement and stormwater collection system for a 6 square-block-area in <br /> the Central Beach area of New Smyrna Beach. Florida. This 52.2 million pro- <br /> I ject consists of shell road reconstruction. inlets, piping. and stormwater vaults, <br /> and exfiltration with pretreatment prior to pumping. Other project tasks in- <br /> clude plan and specifications generation. bidding assistance. and construction <br /> 1 Education phase services. <br /> B.S.. Environmental Engineer- <br /> ing—University of Florida. Project Engineer; Lake Gibson Southwest Drainage Basin Watershed <br /> I 1997 Management Plan, City of Lakeland—Assisted in preparing a watershed <br /> management plan for the Southwest Basin of Lake Gibson in accordance with <br /> the SWFWMD's guidelines and specifications. The project included develop- <br /> ing a GIS database for the basin that includes inventoried structures, updated <br /> 1 Registrations land use. soils. digital terrain model. 100 and 500-year floodplain mappine. <br /> Professional Engineer(Civil), and the basin junction-reach network. Provided construction administration <br /> Florida.No. 62496 services, processing pay requests. conducting progress meetings. and change <br /> OSHA 40-hour HAZWOPER orders. <br /> I training and 8-hour annual <br /> refresher Project Engineer; Dairy Queen Site Redevelopment, Private Developer— <br /> Responsible for design and permitting for stormwater and utility aspects for <br /> I the redevelopment of a commercial site on US-I in New Smyrna Beach. Flori- <br /> da. This project required that the stormwater treatment system meet the re- <br /> Affiliations quirements of the FDOT. SIRWMD. and the City of New Smyrna Beach. <br /> Florida Engineering Society <br /> I Daytona Chapter Officer Project Engineer; B-23 Canal, Quentin L. Hampton & Associates, <br /> Inc./City of Port Orange—Phase I stormwater monitoring, analysis of water <br /> samples. and analysis for effectiveness of stormwater improvements in the <br /> I City of Port Orange. Florida. <br /> Areas of Specialization <br /> Site Engineering Design (grading. Project Manager: Salvador Stormwater Pump Station, Volusia County— <br /> drainage. paving). Stormwater Responsible for the design and permitting of a stormwater pump station to pro- <br /> Management System Design, tect existing homes from flooding. By utilizing a permanent diesel pump for <br /> Flood Mitigation.Water and primary use. and providing for the addition of a mobile trailer mounted pump <br /> Sanitary Sewer System Design for large storm events. the design is able to accommodate complete installation <br /> Permitting, and Construction by County personnel. and avoid the necessity for back-up power. <br /> Administration <br /> Project Manager: Oleander Power Plant Stormwater, Gulf Power— <br /> Responsible for the evaluation of the existing stormwater treatment system in <br /> I Brevard County. Florida. providing construction documents and permitting to <br /> restore the existing wet pond to its original condition. <br /> I Project Engineer: Medulla Generating Station Stormwater Evaluation, <br /> SECI—Responsible for the evaluation of the existing stormwater treatment <br /> system and updating the plant layout for the addition of new facilities and <br /> buildings utilizing aerial photography and GIS capabilities to perform the <br /> evaluation in the most economical means possible. <br /> Project Manager: Seminole Electric Stormwater Evaluation, SECI— <br /> Responsible for the evaluation of the existing stormwater treatment system and <br /> updating the plant layout utilizing GPS methods. Since FDEP approval of the <br /> stormwater treatment system. various site improvements had caused concern <br /> that the approved system was no longer in compliance. Existing site drawings <br /> I were updated with GPS. and new maps were prepared while validating the <br /> system. <br /> IEcIIIIS, <br /> &,,flrnen�Ca mItig a batnology,Inc. PWAUI.YANGCITY OF SUNNY ISI.I:SS,WPFNDICFSRFSUSffS SUNYISISIXIC-043012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.