My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEVEN G. DANSKINE, P.E. <br /> O • Page 2 <br /> • <br /> Project Manager; Second Street South Baffle Box, City of Cocoa Beach— <br /> Responsible for the stormwater quality monitoring for the Second Street South <br /> Baffle Box which is a Suntree Design second generation baffle box for nutri- <br /> ent removal prior to discharge to the Banana River Lagoon. The study moni- <br /> tored nutrients with respect to grain size. and is utilized by the 319(h) grant <br /> program by the EPA and FDEP for evaluation of this type of treatment device. <br /> Project Engineer; Fire Station 52 (Beachside), Schweizer & Waldorf Ar- <br /> chitects and Associates—Prepared site plan and stormwater management <br /> plans for the proposed Beachside Fire Station No. 52 in New Smyrna Beach. <br /> Project tasks included site plan layout. construction drawings. stormwater <br /> management report. ICPR and Ponds modeling FDOT permitting. and envi- <br /> ronmental resource permitting. <br /> Project Manager; Fairmont, Westwood, North Flood Mitigation, City of <br /> New Smyrna Beach—Responsible for the design and permitting for flood <br /> mitigation of a I-square-block area in New Smyrna Beach. Florida The project <br /> requires evaluation of flooding. modeling. public presentation of options. and <br /> design and permitting of upgrades to the drainage system in this area. <br /> Project Manager; Ocean Beach Boulevard Bio-Retention Project, City of <br /> Cocoa Beach—Responsible for the design and permitting for the stormwater <br /> treatment for a I.5-mile stretch of Ocean Beach Boulevard. The project recon- <br /> structs the entire corridor, reducing paved surface: replaces raised medians <br /> with bioswales to provide for stormwater runoff treatment where none previ- <br /> ously existed: and utilizes existing infrastructure to the maximum extent prac- <br /> ticable. Requires coordination with landscape designer. roadway designer. <br /> City and Utility departments. and SJRWMD. <br /> Project Manager; Potable Water Wells Replacement, SECI—Responsible <br /> ' for the design and permitting for the replacement of three community potable <br /> water wells at the facility in Palatka. Florida. Includes substantial testing and <br /> monitoring services to comply with Department of Health and FDEP require- <br /> ments. <br /> Project Manager; Central Beach Phase II Utilities Replacement, <br /> UCNSB—Responsible for design and permitting for the replacement of water <br /> and sanitary sewer facilities in a 6-square-block-area in the Central Beach area <br /> of New Smyrna Beach. Florida. This project. in coordination with a storm- <br /> water/paving project, required replacement and upgrade of approximately <br /> 3.600 feet of water and sanitary sewer mains. and service connections. <br /> Project Manager; North Causeway Force Main, UCNSB—Responsible for <br /> design and permitting for the replacement of approximately 3.500 linear feet <br /> of an undersized force main. The design included a 1.600 foot. 20-inch hori- <br /> zontal directional drill across the intracoastal waterway in Volusia County. <br /> Florida. which necessitated very tight specifications and extensive contractor <br /> Opre-qualification requirements. <br /> Project Manager; Lake Helen Trails Project, City of Lake Helen— <br /> Responsible for the design. plans.and specifications of this Local Agency Par- <br /> ticipation-funded project for equestrian and pedestrian trails in Lake Helen. <br /> Florida. Other project tasks included researching appropriate surface treatment <br /> for the equestrian trail to minimize maintenance. while maintaining an attrac- <br /> t' tive and useable path. <br /> arc mm <br /> Corm/ft 6bctrology,hC PAPAUL YANG CRY OF SUNNY ISIF.SIAPPENDICFSIRESUMES SUNYISLS.00C-0410I2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.