My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:57:38 PM
Creation date
2/2/2016 3:57:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> O YUAN LI, P.E. <br /> I Staff Engineer I <br /> Project Assignment: Storm water <br /> I Project Leader; Pemberton Creek/Baker Canal Watershed Management <br /> Plan, Hillsborough County—Responsible for hydrologic/hydraulic modeling <br /> using Hillsborough County's SWMM. model calibration and verification. <br /> Level of Service (LOS) evaluation. alternatives analysis and final recommen- <br /> I dations. Coordinated project team, provided QA/QC on ERP/capital improve- <br /> ment project (CIP)documents and roadway plans incorporation, model param- <br /> eterization and setup. 100-year floodplain delineation, GIS/database. and final <br /> I Education report. Project involved watershed management plan for a 65-square-mile wa- <br /> tershed in northeast Hillsborough County. Florida. This project was conducted <br /> University of Central Florida. in accordance with the SWFWMD guidelines and specifications(G&S). <br /> I2003 <br /> LLB.Law—Tsinghua University. Project Leader; Delaney Creek/Archie Canal Watershed Management <br /> Beijing. 2001 Plan, Hillsborough County—Responsible for hydrologic/hydraulic modeling <br /> BS. Hydraulic Engineering— using Hillsborough County SWMM. model calibration and verification. LOS <br /> 1 Tsinghua University. Beijing. evaluation, alternatives analysis and final recommendations. Coordinated pro- <br /> 2000 ject team. provided QA/QC on ERP/CIP documents and roadway plans incor- <br /> poration. model parameterization and setup. 100-year floodplain delineation. <br /> GIS/database. and final report. Project involved watershed management plan <br /> I for a 34-square-mile watershed in east central Hillsborough County. Florida. <br /> Registrations This project was conducted in accordance with the SWFWMD's G&S. <br /> Professional Engineer. Florida. <br /> I No. 66595 Project Leader; Lakes Raleigh, Rogers, and Starvation Watershed Man- <br /> agement Program, SWFWNID—Responsible for integrated surface water <br /> and groundwater model development using MIKE SHE/MIKE I I. model' cali- <br /> bration/verification. GIS/database. and final report. Project involved the de- <br /> Areas of Specialization <br /> Hydrology/Hydraulics:Ground- velopment of a watershed management program for a 40-square-mile water- <br /> shed within northwest Hillsborough County. Florida to assist the District's <br /> water: Integrated Surface Water. lake MFL study. The project involved calibration or semi-calibration on 30 <br /> I Groundwater, and Water Quality seepage and drainage lakes within the watershed for a 7-}'ear period. Tasks in- <br /> Modeling:Watershed Manage- eluded integrated surface water and groundwater computer model develop- <br /> ment Plans: Stormwater Master ment and calibration. GIS/database development, report. and technical presen- <br /> Plans: Ecological Restoration: tations. <br /> II Bridge Hydraulics and Scour As- <br /> sessment: GIS Applications Project Leader; East Lake Area Watershed Management Plan, Hills- <br /> borough County—Responsible for hydrologic/hydraulic modeling using <br /> I Hillsborough County SWMM. model calibration and verification. LOS evalua- <br /> tion. alternatives analysis and final recommendations. Coordinated project <br /> team. provided QA/QC on ERP/CIP documents and roadway plans incorpora- <br /> tion. model parameterization. 100-year floodplain delineation. GIS/database. <br /> 1 and final report. Project involved watershed management plan for a 5.078-acre <br /> watershed in central Hillsborough County. Florida.This project was conducted <br /> in accordance with the SWFWMD's G&S. <br /> QProject Engineer; Curiosity Creek Watershed Management Plans, Hills- <br /> borough County—Responsible for hydrologic/hydraulic modeling using <br /> Hillsborough County SWMM. model calibration and verification.LOS evalua- <br /> I tion. alternatives analysis, and final recommendations. Performed ERP/CIP <br /> documents and roadway plans review and incorporation, model parameteriza- <br /> tion. 100-year floodplain delineation, and GIS/database development. Project <br /> I involved watershed management plan for a 2.270-acre watershed in north <br /> Hillsborough County. Florida. This project was conducted in accordance with <br /> the SWFWMD's G&S. <br /> O Project Engineer; Duck Pond Area Watershed Management Plans, Hills- <br /> borough County—Responsible for hydrologic/hydraulic modeling using <br /> Hillsborough County SWMM. model calibration and verification.LOS evalua- <br /> IAC <br /> E""°r""rm Candling a brhnbg,•he rwwr r ust,cm OF SUNNY mrsAraeNDIMS REsuatrs SUNYIS s.noc-02wi2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.