Laserfiche WebLink
II> CONTINUING PROFESSIONAL Z44444IIAA <br /> ARCHITECTURAL & ENGINEERING SERVICES „„.„: ZA AA % AA <br /> IRIS OP,lL`f (CCI ^,) RFO NO. 12 04 02 4 �: <br /> TRAFFIC & TRANSPORTATION ENGINEERING , <br /> CSA cam:°0ei <br /> AAAAAAA AAAI <br /> IMauricio Arze, P.E. • <br /> CONSTRUCTION MANAGEMENT ♦�:�O0 <br /> 1 Mr. Arze has over 24 years of experience dedicated to the areas of construction, design and CSA Group <br /> highway materials testing. His emphasis has been in Construction Engineering and Inspection <br /> (CEI) road and bridge inspection. Mr. Arze's work experience includes but not limited to roadway Education: <br /> Iand bridge widening and re-construction; milling and resurfacing; landscaping; standard concrete B.S. Civil Engineering <br /> box culverts; retaining walls; MSE Walls; sound barrier walls; signature walls; structural supports University of Alabama <br /> for highway signs; highway lighting, traffic signals, Toll Plaza Modifications and ITS Systems. Mr. at Birmingham <br /> I Arze brings the combination of field and supervisory experience managing staff ranging from 5 to 1988 <br /> 25 engineers, inspectors and administrative personnel for CE&I services accumulating over $220 <br /> Million. <br /> Registrations: <br /> I Relevant Experience Professional Engineer <br /> Florida No. 51862 <br /> S.R. 112/1-1195 from 1-95 (N.W. 10th Avenue) to Biscayne Bay, Miami-Dade County, FL — Exp. 2/28/13 <br /> Senior Project Engineer for Construction Engineering and Inspections services for roadway <br /> Iimprovements including roadway and bridge widening, new concrete pavement and the existing Certified General <br /> concrete pavement rehabilitation, retaining walls, barrier walls, guardrails, overhead signs, Contractor Florida No. <br /> relocation of ITS signs, drainage, signalization, lighting, etc. (Construction Costs $19.9 Million) CGC1512458 <br /> IFM No. 405578-1-62-01. Client: FDOT District Six, William Sheridan, (305) 470-5100. Exp. 8/31/2012 <br /> S.R. 112/1-1195 from 1-95 (N.W. 10th Avenue) to Biscayne Bay, Miami-Dade County, FL — <br /> Senior Project Engineer for Construction Engineering and Inspections services for roadway Certifications: <br /> improvements including roadway and bridge widening, new concrete pavement and the existing <br /> CTQP QC Manager <br /> concrete pavement rehabilitation, retaining walls, barrier walls, guardrails, overhead signs, Exp. 9/28/2012 <br /> relocation of ITS signs, drainage, signalization, lighting, etc. (Construction Costs $19.9 Million) CTQP Asphalt Paving <br /> I FM No. 405578-1-62-01. Client: FDOT District Six, William Sheridan, (305) 470-5100. Level I & II <br /> Homestead Extension of Florida's Turnpike (HEFT III) Milling and Resurfacing MP 38.7 to MP Exp. 9/28/2012 <br /> 44.2, Miami-Dade/Broward Counties, FL — Senior Project Engineer responsible for CEI services. Advanced Work Zone <br /> 11 (Construction Costs $2.9 Million), Client: Florida Turnpike Enterprises, Mario Rojas, (954) 975- Traffic Control, ATSSA <br /> 4855. Exp. 12/3/12 <br /> Homestead Extension of Florida's Turnpike (HEFT-II) Milling and Resurfacing MP 0.0 to MP 9.2, FDEP Qualified <br /> 11 Miami-Dade/Broward Counties, FL - Senior Project Engineer responsible for CEI services. Stormwater <br /> (Construction Costs $5.5 Million), Client: Florida Turnpike Enterprises, Mario Rojas, (954) 975- Management Inspector <br /> 4855. <br /> RSO-Nuclear Gauge <br /> Homestead Extension of Florida's Turnpike (HEFT-I) Milling and Resurfacing MP 10.6 to MP Safety Training <br /> 16.8 and MP 19.7 to MP 22.5, Miami-Dade/Broward County, FL - Senior Project Engineer Program <br /> responsible for CEI services. (Construction Costs $8.9 Million) Client: Florida Turnpike 10-Hour Occupational <br /> Enterprises, Mario Rojas, (954) 975-4855. Safety and Health <br /> Improvements to Deerfield Toll Plaza Sawgrass Expressway/Florida's Turnpike Interchange, Class, OSHA <br /> Broward County, FL - Project Engineer responsible for CEI services on the construction of a Engineering Concepts <br /> a double-span SunPass Gantry with Equipment Building, to the west of the existing Deerfield for Bridge Inspectors, <br /> Mainline Toll Plaza; roadway, electrical and mechanical systems, landscaping, highway lighting, National Highway <br /> signing/pavement marking and tunnel modifications; construction of concrete signature walls, Institute <br /> retaining and ITS devices. (Construction Costs $39.2 Million) Client: Florida Turnpike <br /> Enterprises, Eric Rush, Project Manager (954) 975-4855. <br /> Widening of Sawgrass Expressway from Coral Ridge Drive to Florida's Turnpike Mainline, Broward <br /> County, FL - This project consists of widening the existing Sawgrass Expressway from 4 lanes to <br /> 11 6 lanes towards the median. There are a total of six conventional simple supported bridges which <br /> also get widened within this stretch of the Expressway. Sound Barrier Walls, Lighting, <br /> Signing/Pavement Markings, Landscaping and ITS construction. Responsible for CEI services. <br /> O <br /> (Construction Costs $81 Million) Client: Florida Turnpike Enterprises, Mario Rojas, Project <br /> Manager (954) 975-4855. m <br />